Paragraph 2 InterpretationI1
England and Wales
In this Part of this Schedule—
“facilities proximity area” means an obstacle-free area comprising a cylinder with a horizontal radius of one point two six nautical miles (1.26nm) extending from the centre of the existing Waveney platform located within the Licence and extending vertically from mean sea level;
“Licence” means United Kingdom Petroleum Production Licence P.780 Block 48/17c;
“Licensee” means the licensee from time to time of the Licence, who at the date hereof is Perenco;
“line of sight” the line of sight communications link from the existing Waveney platform located within the Licence to/from any other installation and/or to/from any onshore control room together with any associated infrastructure, equipment, software, systems, circuits, channels and licenses;
“Perenco” means Perenco North Sea Limited (company number SC293676) registered at C/O Dwf Llp, 2 Semple Street, Edinburgh, Scotland, EH3 8BL;
“pipeline” means the 8-inch (8”) diameter gas pipeline with pipeline reference number PL- 2555 connecting the Durango well to the Waveney platform located within the Licence, together with any associated umbilicals, plant and equipment serving that pipeline;
“pipeline proximity area” means the area five hundred (500) metres either side and directly above the pipeline; and
“specified works” means any works comprised within the authorised development, including temporary surface infrastructure, which are—
- (a)
within the pipeline proximity area;
- (b)
relate to any part of the authorised development; and
- (c)
which would or may in any way adversely affect the pipeline or Licensee’s access to the pipeline,
- (a)
but excluding works for the construction of wind turbine generators or offshore substation platforms.
Annotations
Commencement
- I1
Sch. 14 Pt. 14 para. 2 in force at 9.5.2024, see art. 1