OpenLegislation

Paragraph

Work No. 19 – shown on sheet 3 of the works plans and being the improvement to the existing Tidal Basin Road for a length of 280 metres, to include resurfacing works to the existing Tidal Basin Road from the junction with the improved Tidal Basin Roundabout (Work No. 16) to the existing junction with the A1011/A1020 Silvertown Way southbound carriageway.