The Silvertown Tunnel Order 2018
S.I. 2018/574 · Made 10 May 2018 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 10th May 2018
Coming into force 31st May 2018
An application has been made to the Secretary of State, under section 37 of the Planning Act 2008 M1 (“the 2008 Act”) in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 M2 for an Order granting development consent.
The application was examined by a Panel of three members (“the Panel”) pursuant to Chapter 2 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 2010 M3.
The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 74(2) of the 2008 Act, made a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
In accordance with section 132(3) of the 2008 Act, the Secretary of State is satisfied, having considered the report and recommendation of the Panel, that the parcels of open space comprised within the Order land, when burdened with a new right created under this Order, will be no less advantageous than they were before the making of this Order to the following persons: (a) the persons in whom they are vested; (b) other persons, if any, entitled to rights of common or other rights; and (c) the public.
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120, 122, 123 and 149A of, and paragraphs 1 to 3, 10 to 18, 20 to 24, 26, 30A, 30B, 32A, 32B, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Marginal citations
- M1
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- M2
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522 and S.I. 2013/755.
- M3
S.I. 2010/103, amended by S.I. 2012/635.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: WORKS PROVISIONS
- Principal powers
- 3Disapplication of legislation, etc.
- 4Development consent granted by the Order
- 5Limits of deviation
- Streets
- 6Street works
- 7Application of the 1991 Act
- 8Construction and maintenance of new, altered or diverted streets
- 9Permanent stopping up of streets and private means of access
- 10Temporary stopping up and restriction of use of streets
- 11Access to works
- 12Agreements with street authorities
- 13Use of private roads for construction
- Supplemental powers
- 14Discharge of water
- 15Protective works to buildings
- 16Authority to survey and investigate land
- 17Work in the river Thames: conditions
- 18Felling or lopping of trees
- Part 3: POWERS OF ACQUISITION AND POSSESSION OF LAND
- Powers of acquisition
- 19Compulsory acquisition of land
- 20Compulsory acquisition of land – incorporation of the minerals code
- 21Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily
- 22Compulsory acquisition of rights
- 23Private rights over land
- 24Power to override easements and other rights
- 25Modification of Part 1 of the 1965 Act
- 26Application of the 1981 Act
- 27Acquisition of subsoil, etc., only
- 28Rights over or under streets
- Temporary possession of land
- 29Temporary use of land for carrying out the authorised development
- 30Temporary use of land for maintaining the authorised development
- Supplementary
- 31Statutory undertakers
- 32Apparatus and rights of statutory undertakers in stopped up streets
- 33Recovery of costs of new connection
- 34Special category land
- 35Disposals by the Greater London Authority
- Compensation
- 36Disregard of certain interests and improvements
- 37Set-off for enhancement in value of retained land
- 38No double recovery
- Part 4: OPERATIONAL PROVISIONS
- 39Application of Part 4
- 40Maintenance of the authorised development
- 41Local legislation relating to the Blackwall Tunnel
- 42Power to operate and use the tunnels
- 43Closing the tunnels
- 44Removal of motor vehicles
- 45Removal of other obstructions
- 46Dangerous goods
- 47No apparatus in the Silvertown Tunnel area without consent
- 48Byelaws relating to the Silvertown Tunnel area and the Blackwall Tunnel area
- 49Fixed penalty notices
- 50Classification of roads, etc.
- 51Operational land for purposes of the 1990 Act
- 52Restrictions on other works in the river Thames
- Part 5: USER CHARGING
- 53The charging policy
- 54Power to charge for use of the tunnels
- 55Payment and recovery of charges and penalty charges
- 56Penalty charges, examination of motor vehicles, etc.
- 57Application by TfL of charges levied
- Part 6: MISCELLANEOUS AND GENERAL
- 58Benefit of Order
- 59Transfer of benefit of Order, etc.
- 60Application of landlord and tenant law
- 61Traffic regulation measures
- 62Deemed marine licence
- 63Defence to proceedings in respect of statutory nuisance
- 64Protective provisions
- 65Certification of documents
- 66Silvertown Tunnel Implementation Group
- 67Service of notices
- 68Arbitration
- 69Consents, agreements and approvals
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Schedule 2: REQUIREMENTS
- Part 1: REQUIREMENTS
- 1Interpretation
- 2Time limit for commencement of the authorised development
- 3Design principles and design review panel
- 4Detailed design of above ground buildings and structures
- 5Code of construction practice and related plans and strategies
- 6Landscaping scheme
- 7Monitoring and mitigation strategy
- 8Surface water drainage details
- 9External lighting details
- 10Signage strategy
- 11Flood risk assessment
- 12Operational noise mitigation measures
- 13Siebert Road and Westcombe Hill area noise barriers
- 14Cross-river bus services
- 15Cross-river cycle/pedestrian facilities
- 16Biodiversity action plan and mitigation strategy
- 17Contaminated land
- 18Hazardous substances – East Greenwich Gasholder site
- 19Hazardous substances – Brenntag Chemicals site
- 20Re-use of excavated material on-site
- 21Local business transitional support
- Part 2: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 22Interpretation
- 23Applications made under requirements
- 24Further information regarding requirements
- 25Appeals
- Schedule 3: PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS
- 1HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED
- 2HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 3PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED
- 4PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- Schedule 4LAND IN WHICH ONLY NEW RIGHTS MAY BE ACQUIRED
- Schedule 5: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
- Part: Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Part: Application of Part 1 of the 1965 Act
- 4Paragraph 4
- 5Paragraph 5
- Schedule 6LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
- Schedule 7LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 8: REMOVAL OF MOTOR VEHICLES AND RECOVERY OF PENALTY CHARGES
- Part 1: PRELIMINARY
- 1Paragraph 1
- Part 2: REPRESENTATIONS AND APPEALS IN RELATION TO THE REMOVAL OF MOTOR VEHICLES
- 2Persons to whom Part 2 applies
- 3Right to make representations
- 4Right to appeal to an adjudicator
- Part 3: RECOVERY OF PENALTY CHARGES
- 5Penalty charge notices
- 6Representations against penalty charge notice
- 7Cancellation of penalty charge notice
- 8Rejection of representations against penalty charge notice
- 9Adjudication by an adjudicator
- 10Charge certificates
- 11Enforcement of charge certificate
- 12Invalid notices
- 13Enforcement by execution
- 14Paragraph 14
- 15Service by post
- 16Procedure
- Schedule 9: BLACKWALL AND SILVERTOWN TUNNELS BYELAWS
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: CONDUCT AND BEHAVIOUR
- 3Smoking etc.
- 4Unacceptable behaviour
- Part 3: EQUIPMENT AND SAFETY
- 5General safety
- Part 4: ACCESS AND TRAFFIC
- 6Unauthorised access and loitering
- 7Traffic regulation
- 8Dangerous goods
- Part 5: ENFORCEMENT, ETC.
- 9Name and address
- 10Compliance with instructions and notices, etc.
- 11Identification of authorised persons
- 12Breaches by authorised persons
- 13Attempted breach
- Schedule 10: CLASSIFICATION OF ROADS, ETC.
- Part 1: CLASSIFICATION AND DESIGNATION OF GLA ROADS (TRANSPORT FOR LONDON ROAD NETWORK)
- Paragraph
- 1A12 Blackwall Tunnel Southern Approach Southbound
- 2A12 Blackwall Tunnel Southern Approach Northbound
- 3A12 Crossover between Blackwall Tunnel Southern Approach Northbound and Southbound Carriageways
- 4Pavilion Lane (Realigned) (to Millennium Way)
- 5Pavilion Lane (Realigned) (from Millennium Way)
- 6A102 Silvertown Tunnel Southern Approach Northbound
- 7A102 Silvertown Tunnel Southern Approach Southbound
- 8A102 The Silvertown Tunnel Northbound
- 9A102 The Silvertown Tunnel Southbound
- 10A102 The Silvertown Tunnel Northern Approach Northbound
- 11A102 The Silvertown Tunnel Northern Approach Southbound
- 12A102 Silvertown Way Off-Slip (Dedicated Left Turn)
- 13A102 Tidal Basin Roundabout
- 14A102 Lower Lea Crossing Eastbound
- 15A102 Lower Lea Crossing Westbound
- 16A102 Lower Lea Crossing (Eastbound and Westbound)
- 17A102 Leamouth Circus Roundabout
- 18A102 Leamouth Road (Northbound and Southbound)
- 19A12 Blackwall Tunnel Northern Approach Southbound
- 20A12 Blackwall Tunnel Northern Approach Northbound
- 21A12 Blackwall Tunnel Southbound
- 22A12 Blackwall Tunnel Northbound
- Part 2: RE-DESIGNATION OF GLA ROAD AS A LOCAL AUTHORITY (‘BOROUGH’) ROAD
- Paragraph
- 23Tunnel Avenue
- Schedule 11: TRAFFIC REGULATION MEASURES, ETC.
- Part 1: SPEED LIMITS AND RESTRICTED ROADS
- Paragraph
- Paragraph
- 2TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)
- 3PRESCRIBED ROUTES
- 4REVOCATIONS & VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
- 5VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS DUE TO ROAD RE-CLASSIFICATION
- Schedule 12: DEEMED MARINE LICENCE
- Part 1: GENERAL
- 1Interpretation
- 2Contacts
- 3Details of licensed marine activities
- Part 2: CONDITIONS APPLYING TO CONSTRUCTION ACTIVITIES
- 4Benthic ecology monitoring and mitigation
- 5Construction method statement
- 6Marine pollution contingency plan
- 7Concrete and cement
- 8Coatings and treatments
- 9Spills, etc.
- 10Percussive piling
- 11Archaeological written scheme of investigation
- 12Removal of temporary structures, etc.
- Part 3: PROCEDURE FOR THE DISCHARGE OF CONDITIONS
- 13Meaning of “application”
- 14Further information regarding application
- 15Determination of application
- 16Notice of determination
- 17Arbitration
- Schedule 13: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Part 3: FOR THE PROTECTION OF NATIONAL GRID
- 16Application
- 17Interpretation
- 18Paragraph 18
- 19Apparatus of National Grid in stopped up streets
- 20Acquisition of land
- 21Removal of apparatus
- 22Facilities and rights for alternative apparatus
- 23Retained apparatus: protection of National Grid as Gas Undertaker
- 24Retained apparatus: protection of National Grid as Electricity Undertaker
- 25Protective works to buildings
- 26Expenses
- 27Indemnity
- 28Enactments and agreements
- 29Co-operation
- 30Access
- 31Arbitration
- Part 4: FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY
- 32Paragraph 32
- 33Definitions
- 34Approval of detailed design
- 35Design of the tunnelling works
- 36As built drawings
- 37Discharges, etc.
- 38Paragraph 38
- 39Navigational lights, buoys, etc.
- 40Directions as to lights
- 41Removal, etc. of the PLA's moorings and buoys
- 42Removal of temporary works
- 43Protective action
- 44Abandoned or decayed works
- 45Facilities for navigation
- 46Survey of riverbed
- 47Statutory functions
- 48Indemnity
- 49Compensation for temporary works
- 50Apparatus in the Silvertown Tunnel area
- 51Disposals, etc.
- 52Disputes
- Part 5: FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
- 53Paragraph 53
- 54Definitions
- 55Structural integrity of flood defences
- 56Specified works
- 57Approvals
- 58Inspection and construction
- 59Maintenance of the flood defences
- 60Emergency powers
- 61Protection for fish and fisheries
- 62Indemnities and costs
- 63Notices
- 64Dispute resolution
- Part 6: FOR THE PROTECTION OF THE LONDON BOROUGH OF NEWHAM AND THE ROYAL BOROUGH OF GREENWICH
- 65Paragraph 65
- 66Paragraph 66
- 67Paragraph 67
- 68Paragraph 68
- 69Paragraph 69
- 70Paragraph 70
- 71Paragraph 71
- 72Paragraph 72
- 73Paragraph 73
- 74Paragraph 74
- 75Paragraph 75
- 76Paragraph 76
- Schedule 14DOCUMENTS TO BE CERTIFIED
- Explanatory note