Paragraph
Works No. 20B – shown on sheet 3 of the works plans and comprising—
(a)
dredging works and construction operations (including piling and scour preventative and remedial works) within the river Thames;
(b)
the placing of any mooring buoy, or any buoy for navigation or other purposes;
(c)
associated works required for strengthening of the existing river wall related to Work No. 20B; and
(d)
the alteration, cleaning, modification and refurbishment of the existing NAABSA (Not Always Afloat But Safely Aground) berth to enable it to be used in connection with the construction of the authorised development,