Paragraph
Work No. 4 – shown on sheet 1 of the works plans and being the works required for the improvement of the existing Tunnel Avenue from a point 65 metres south of a point level with the junction of the existing Tunnel Avenue with Morden Wharf Road, to a point adjacent to the location of the existing Blackwall Tunnel Gatehouse, to include—
works to improve the alignment of the existing Tunnel Avenue to provide a segregated and independent local two-way carriageway over a length of 485 metres;
the construction of new (replacement) private means of access to local business premises as shown on sheet 1 of the rights of way and access plans, and replacement car parking;
the construction of an improved bus-only access to, and operational egress from, the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);
the construction of a new hardened verge between the improved Tunnel Avenue and the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);
the construction of new overhead signage and traffic management equipment gantries;
the removal of redundant existing gantries; and
the provision of improved non-motorised user route alongside the improved Tunnel Avenue.