Work No. 4 – shown on sheet 1 of the works plans and being the works required for the improvement of the existing Tunnel Avenue from a point 65 metres south of a point level with the junction of the existing Tunnel Avenue with Morden Wharf Road, to a point adjacent to the location of the existing Blackwall Tunnel Gatehouse, to include—

(a)

works to improve the alignment of the existing Tunnel Avenue to provide a segregated and independent local two-way carriageway over a length of 485 metres;

(b)

the construction of new (replacement) private means of access to local business premises as shown on sheet 1 of the rights of way and access plans, and replacement car parking;

(c)

the construction of an improved bus-only access to, and operational egress from, the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);

(d)

the construction of a new hardened verge between the improved Tunnel Avenue and the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);

(e)

the construction of new overhead signage and traffic management equipment gantries;

(f)

the removal of redundant existing gantries; and

(g)

the provision of improved non-motorised user route alongside the improved Tunnel Avenue.