OpenLegislation

Schedule 12 DOCUMENTS TO BE CERTIFIED

Original text. Later amendments are not shown.

(1) Document name(2) Document reference(3) Version(4) Date
Site location plan1.12November 2025
Land plans2.14January 2026
Works plans2.23December 2025
Access and public rights of way plan2.32July 2025
Book of reference4.33April 2026
Environmental Statement: Non Technical Summary6.12March 2026
Environmental Statement: Chapter 0 Contents6.2.01April 2025
Environmental Statement: Chapter 1 Introduction6.2.11April 2025
Environmental Statement: Chapter 2 EIA Methodology & Public Consultation6.2.21April 2025
Environmental Statement: Chapter 3 Site Description, Site Selection and Iterative Design Process6.2.31April 2025
Environmental Statement: Chapter 4 Proposed Development6.2.41April 2025
Environmental Statement: Chapter 5 Planning Policy6.2.51April 2025
Environmental Statement: Chapter 6 Landscape and Visual Impact and Residential Amenity6.2.61April 2025
Environmental Statement: Chapter 7 Ecology and Biodiversity6.2.73April 2026
Environmental Statement: Chapter 8 Hydrology, Hydrogeology, Flood Risk and Drainage6.2.82January 2026
Environmental Statement: Chapter 9 Cultural Heritage6.2.91April 2025
Environmental Statement: Chapter 10 Socio Economics6.2.101April 2025
Environmental Statement: Chapter 11 Noise and Vibration6.2.111April 2025
Environmental Statement: Chapter 12 Climate Change6.2.121April 2025
Environmental Statement: Chapter 13 Transport and Access6.2.131April 2025
Environmental Statement: Chapter 14 Air Quality6.2.142January 2026
Environmental Statement: Chapter 16 Land Use and Agriculture6.2.152March 2026
Environmental Statement: Chapter 16 Glint and Glare6.2.161April 2025
Environmental Statement: Chapter 17 Miscellaneous Issues6.2.171April 2025
Environmental Statement: Chapter 18 Summary6.2.182March 2026
Environmental Statement: Chapter 19 Glossary6.2.191April 2025
Environmental Statement: Appendix 1.1 Steeple Project Environment Impact Assessment Scoping Report6.3.1, Appendix 1.11April 2025
Environmental Statement: Appendix 1.2 EIA Scoping Opinion6.3.1, Appendix 1.21April 2025
Environmental Statement: Appendix 1.3 Environment Agency EIA Scoping Response6.3.1, Appendix 1.31April 2025
Environmental Statement: Appendix 1.4 EIA Statement of Competence6.3.1, Appendix 1.41April 2025
Environmental Statement: Appendix 2.1 Schedule 4 Requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 as amended6.3.2 Appendix 2.11April 2025
Environmental Statement: ES Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report6.3.2 Appendix 2.22December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 16.3.2, Appendix 2.2 Part 12December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 26.3.2, Appendix 2.2 Part 22December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 36.3.2, Appendix 2.2 Part 32December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 46.3.2, Appendix 2.2 Part 42January 2026
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 56.3.2, Appendix 2.2 Part 52January 2026
Environmental Statement: Appendix 2.3 Cumulative Sites Long List and Short List6.3.2, Appendix 2.31April 2025
Environmental Statement: Appendix 4.1 Outline construction environmental management plan6.3.4, Appendix 4.13March 2026
Environmental Statement: Appendix 4.2 Outline decommissioning plan6.3.4, Appendix 4.23March 2026
Environmental Statement: Appendix 4.3 Outline fire risk management plan6.3.4, Appendix 4.33March 2026
Environmental Statement: Appendix 4.4 Outline operational environmental management plan6.3.4, Appendix 4.43March 2026
Environmental Statement: Appendix 4.5 Outline design principles6.3.4, Appendix 4.52January 2026
Environmental Statement: Appendix 4.6 Crossings Schedule6.3.4, Appendix 4.61April 2025
Environmental Statement: Appendix 6.1 Viewpoint Photograph Record – Cumulative Annotations Part A and Part B6.3.6, Appendix 6.11January 2026
Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer6.3.6, Appendix 6.21April 2025
Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer with Cumulative Annotations6.3.6, Appendix 6.21January 2026
Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter6.3.6, Appendix 6.21April 2025
Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter With Cumulative Annotations6.3.6, Appendix 6.21January 2026
Environmental Statement: Appendix 6.3 Viewpoint Assessment6.3.6, Appendix 6.32March 2026
Environmental Statement: Appendix 6.4 – Residential Visual Amenity Assessment6.3.6, Appendix 6.41April 2025
Environmental Statement: Appendix 6.5 Arboricultural impact assessment6.3.6, Appendix 6.51April 2025
Environmental Statement: Appendix 6.6 Assessment of Public Rights of Way6.3.6 Appendix 6.62March 2026
Environmental Statement: Appendix 7.1 Legislation and Policy6.3.7 Appendix 7.11April 2025
Environmental Statement: Appendix 7.2 Designated Sites6.3.7 Appendix 7.21April 2025
Environmental Statement: Appendix 7.3 Habitat Report6.3.7 Appendix 7.31April 2025
Environmental Statement: Appendix 7.4 Breeding Bird Report6.3.7 Appendix 7.41April 2025
Environmental Statement: Appendix 7.5 Barn Owl Report (Confidential)6.3.7 Appendix 7.51April 2025
Environmental Statement: Appendix 7.6 Wintering Bird Report6.3.7 Appendix 7.61April 2025
Environmental Statement: Appendix 7.7 Bat Report6.3.7 Appendix 7.71April 2025
Environmental Statement: Appendix 7.8 Badger Report (Confidential)6.3.7 Appendix 7.81April 2025
Environmental Statement: Appendix 7.9 Otter and Water Vole Report6.3.7 Appendix 7.91April 2025
Environmental Statement: Appendix 7.10 Great Crested Newt Report6.3.7 Appendix 7.101April 2025
Environmental Statement: Appendix 7.11 Aquatic Invertebrates Report6.3.7 Appendix 7.111April 2025
Environmental Statement: Appendix 7.12 Biodiversity Net Gain6.3.7 Appendix 7.121April 2025
Environmental Statement: Appendix 7.13 Skylark Mitigation Strategy6.3.7 Appendix 7.131April 2025
Environmental Statement: Appendix 7.14 Outline landscape ecology management plan6.3.7 Appendix 7.142April 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 16.3.8 Appendix 8.1 Part 14March 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 Rev 2 Appendix E update6.3.8 Appendix 8.1 Part 11January 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 26.3.8 Appendix 8.1 Part 21April 2025
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 36.3.8 Appendix 8.1 Part 32January 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 Appendix G update only6.3.8 Appendix 8.1 Part 31January 2026
Environmental Statement: Appendix 8.2 Surface water drainage strategy6.3.8 Appendix 8.24March 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 2 Appendix B update only

6.3.8 Appendix 8.2

2January 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix G update only

6.3.8 Appendix 8.2

1January 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only

6.3.8 Appendix 8.2

1January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only

6.3.8 Appendix 8.2

1January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix L (New)

6.3.8 Appendix 8.2

1January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix M (New)

6.3.8 Appendix 8.2

1January 2026
Environmental Statement: Appendix 8.3 Water Framework Directive Assessment6.3.8, Appendix 8.32January 2026
Environmental Statement: Appendix 9.1 Cultural Heritage Technical Baseline6.3.9 Appendix 9.11April 2025
Environmental Statement: Appendix 9.2 Magnitude Surveys Geophysical Survey Report6.3.9 Appendix 9.22March 2026
Environmental Statement: Appendix 9.3 Archaeological Mitigation Statement6.3.9 Appendix 9.31April 2025
Environmental Statement: Appendix 9.4 Outline written scheme of investigation for pre-determination trial trenching6.3.9 Appendix 9.41April 2025
Environmental Statement: Appendix 9.5 Outline written scheme of investigation for post consent archaeological works6.3.9 Appendix 9.52April 2026
Environmental Statement: Appendix 10.1 Outline supply chain, employment and skills plan6.3.10 Appendix 10.12January 2026
Environmental Statement: Appendix 13.1 Transport Assessment6.3.13 Appendix 13.11April 2025
Environmental Statement: Appendix 13.2 Outline construction traffic management plan6.3.13 Appendix 13.22March 2026
Environmental Statement: Appendix 14.1 Air Quality Appendices6.3.14 Appendix 14.11April 2025
Environmental Statement: Appendix 15.1 Agricultural Land Classification Report6.3.15 Appendix 15.11April 2025
Environmental Statement: Appendix 15.2 Outline soil management plan6.3.15 Appendix 15.22January 2026
Environmental Statement: Appendix 16.1 Solar6.3.16 Appendix 16.11April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 16.3.17 Appendix 17.1 Part 11April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 26.3.17 Appendix 17.1 Part 21April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 36.3.17 Appendix 17.1 Part 31April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 46.3.17 Appendix 17.1 Part 41April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 56.3.17 Appendix 17.1 Part 51April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 66.3.17 Appendix 17.1 Part 61April 2025
Figure 1.1 Site Location Plan6.4.1, Figure 1.12July 2025
Figure 2.1 Indicative Site Layout6.4.2, Figure 2.12July 2025
Figure 2.2 Cumulative Schemes Plan6.4.2, Figure 2.21April 2025
Figure 3.1 Site Constraints Plan6.4.3, Figure 3.11April 2025
Figure 3.2 Topographical Survey6.4.3. Figure 3.22July 2025
Figure 3.3 Public Rights of Way Plan6.4.3, Figure 3.31April 2025
Figure 3.4 Alternative Sites6.4.3, Figure 3.41April 2025
Figure 6.1 Site Location Plan6.4.6, Figure 6.11April 2025
Figure 6.2 Landscape Designations6.4.6, Figure 6.21April 2025
Figure 6.3 Topography6.4.6, Figure 6.31April 2025
Figure 6.4 Landscape Character Areas6.4.6, Figure 6.41April 2025
Figure 6.5a Visual Receptors (Settlements, A Roads, B Roads and Long-Distance Routes) Revision D6.4.6, Figure 6.5a1June 2025
Figure 6.5b Visual Receptors (Settlements, A Roads, B Roads and PROW)6.4.6, Figure 6.5b1April 2025
Figure 6.5c Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)6.4.6, Figure 6.5c1April 2025
Figure 6.6a Screened Zone of Theoretical Visibility (SZTV) and viewpoint (VP) Locations (10km radius)6.4.6, Figure 6.6a1April 2025
Figure 6.6b SZTV and VP Locations (5km radius)6.4.6, Figure 6.6b1April 2025
Figure 6.6c SZTV and VP Locations (2km radius)6.4.6, Figure 6.6c1April 2025
Figure 6.7 SZTV and Landscape Character6.4.6, Figure 6.71April 2025
Figure 6.8a SZTV and Visual Receptors (Settlements, A Roads, B Roads and Long Distance Routes)6.4.6, Figure 6.8a1April 2025
Figure 6.8b SZTV and Visual Receptors (Settlements, A Roads, B Roads and PROW)6.4.6, Figure 6.8b1April 2025
Figure 6.8c SZTV and Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)6.4.6, Figure 6.8c1April 2025
Figure 6.9 Outline Landscape and Ecology Mitigation Strategy6.4.6, Figure 6.91April 2025
6.4.8 Figure 8.1 Watercourses6.4.8, Figure 8.11April 2025
6.4.8 Figure 8.2 Environment Agency Flood Zones6.4.8, Figure 8.21April 2025
6.4.8 Figure 8.3 Environment Agency Surface Water Flood Extents6.4.8, Figure 8.31April 2025
6.4.8 Figure 8.4 Groundwater and Surface Water Abstractions6.4.8, Figure 8.41April 2025
6.4.9 Figure 9.1 Heritage Assets Considered Within The Environmental Statement6.4.9, Figure 9.11April 2025
6.4.9 Figure 9.2 Designated Heritage Assets Within Relevant Study Area6.4.9, Figure 9.21April 2025
6.4.9 Figure 9.3 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area6.4.9, Figure 9.31April 2025
6.4.9 Figure 9.4 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area6.4.9, Figure 9.41April 2025
6.4.9 Figure 9.5 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area6.4.9, Figure 9.51April 2025
6.4.9 Figure 9.6 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area6.4.9, Figure 9.61April 2025
6.4.9 Figure 9.7 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area6.4.9, Figure 9.71April 2025
6.4.9 Figure 9.8 Important Hedgerows (Heritage)6.4.9, Figure 9.81April 2025
6.4.10 Figure 10.1 Primary Impact Zone6.4.10, Figure 10.11April 2025
6.4.10 Figure 10.2 Secondary Impact Zone6.4.10, Figure 10.21April 2025
6.4.11 Figure 11.1 Assessment Locations and Daytime Specific Sound Levels6.4.11, Figure 11.11April 2025
6.4.11 Figure 11.2 Assessment Locations and Night-time Specific Sound Levels6.4.11, Figure 11.21April 2025
6.4.17 Figure 17.2 Utilities Plan6.4.17, Figure 17.21April 2025
West Burton Power Station plan8.611April 2026