The Submarine Pipe-lines (Designated Owners) (No. 6) Order 1992

S.I. 1992/890 · Made 20 March 1992

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

PIPE-LINES

Made 20th March 1992

Coming into force 16th April 1992

The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975f1 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving those persons affected an opportunity of being heard with respect to the matter, hereby makes the following Order:—

Annotations to the whole text

Footnotes

f1

1975 c. 74.

Contents

  1. 1Article 1
  2. 2Article 2
  3. Signature
  4. Schedule
  5. Idesignated owners
  6. IIdescription of pipe-lines
  7. Explanatory note

1

This Order may be cited as the Submarine Pipe-lines (Designated Owners) (No. 6) Order 1992 and shall come into force on 16th April 1992.

2

For the purposes of Part III of the Act, each person specified in Part I of the Schedule hereto is hereby designated as the owner of the pipe-lines described in Part II of the Schedule hereto.

Signature

Colin Moynihan

Parliamentary Under Secretary of State,

Department of Energy

20th March 1992

Idesignated owners

  • Amerada Hess Ltd., whose registered office is at 2 Stephen Street, London W1P 1PL.

  • BG North Sea Holdings Limited whose registered office is at Rivermill House, 152 Grosvenor Road, London SW1V 3JL.

  • Enterprise Oil plc, whose registered office is at Grand Buildings, Trafalgar Square, London WC2N 5EJ.

  • Mobil North Sea Ltd., whose principal place of business in the United Kingdom is at Mobil Court, 3 Clements Inn, London WC2A 2EB.

  • OMV (U.K.) Limited whose registered office is at 14 Ryder Street, London SW1Y 6QB.

IIdescription of pipe-lines

Route of pipe-lines (1)From (2)To (3)
Number of pipelines lying along route (4)Nominal diameter of pipes in inches (5)Date brought into use
Ness II Subsea Well 9/13b-45zBeryl B Platform1629.9.89
Ness II Subsea Well 9/13b-49Beryl B Platform1618.9.90
Linnhe Subsea Well 9/13c-40zBeryl B Platform1625.10.89
Beryl B PlatformNess II Subsea Structure40.524.11.89
Beryl B PlatformNess II Subsea Structure20.37524.11.89
Linnhe Subsea WellBeryl B Platform16Not yet in use
Beryl B PlatformLinnhe Subsea Well 9/13c-44z1626.11.89
Beryl B PlatformLinnhe Gas Lift Manifold1612.2.90
Beryl B PlatformLinnhe Subsea Structure40.520.12.89
Beryl B PlatformLinnhe Subsea Structure20.37520.12.89

Explanatory note

(This note is not part of the Order)

This Order designates the companies listed in Part I of the Schedule as owners of the pipe-lines described in Part II of the Schedule. The pipe-lines lie above and between the Beryl, Linnhe and Ness oilfields south-east of the Shetland Islands.