Paragraph 29 FencingI1
England, Wales and Scotland
Where so required by the engineer acting reasonably the undertaker must, to the reasonable satisfaction of the engineer, fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterway, whether on a temporary or permanent basis or both.
Annotations
Commencement
- I1
Sch. 15 para. 29 in force at 5.11.2025, see art. 1