The Tillbridge Solar Order 2025
S.I. 2025/1105 · Made 14 October 2025 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 14th October 2025
Coming into force 5th November 2025
The application has been examined by the Examining Authority appointed by the Secretary of State pursuant to chapter 3 of Part 6 of the 2008 Act and carried out in accordance with chapter 4 of Part 6 of the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Examining Authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74(2)f4 of the 2008 Act made a report and recommendation to the Secretary of State.
The Secretary of State has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f5 and has had regard to the documents and matters referred to in section 104(2)(c) of the 2008 Act.
The Secretary of State, having decided the application, has determined to make an Order granting development consent for the development described in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
The Secretary of State, in exercise of the powers conferred by sections 114f6, 115f7, 120f8, 122f9, 123f10 and 140 of the 2008 Act, makes the following Order.
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13 to, the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572 and S.I. 2018/378.
- f3
- f4
-
As amended by paragraph 29(1) and (3) of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).
- f5
- f6
-
As amended by paragraph 55 of Part 1 of Schedule 13 to the Localism Act 2011.
- f7
-
As amended by section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- f8
-
As amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13 to, the Localism Act 2011.
- f9
-
As amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f10
-
As amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by this Order
- 4Operation of generating station
- 5Power to maintain the authorised development
- 6Application and modification of statutory provisions
- 7Defence to proceedings in respect of statutory nuisance
- Part 3: STREETS
- 8Street works
- 9Application of the relevant permit scheme
- 10Power to alter layout, etc., of streets
- 11Construction and maintenance of altered streets
- 12Temporary prohibition or restriction of the use of streets and public rights of way
- 13Claimed public right of way
- 14Use of private roads
- 15Access to works
- 16Agreements with street authorities
- 17Traffic regulation measures
- Part 4: SUPPLEMENTAL POWERS
- 18Discharge of water
- 19Protective works to buildings
- 20Authority to survey and investigate the land
- Part 5: POWERS OF ACQUISITION
- 21Compulsory acquisition of land
- 22Time limit for exercise of authority to acquire land compulsorily
- 23Compulsory acquisition of rights
- 24Private rights
- 25Application of the 1981 Act
- 26Acquisition of subsoil only
- 27Power to override easements and other rights
- 28Modification of Part 1 of the Compulsory Purchase Act 1965
- 29Rights under or over streets
- 30Temporary use of land for constructing the authorised development
- 31Temporary use of land for maintaining the authorised development
- 32Statutory undertakers
- 33Apparatus and rights of statutory undertakers in closed streets
- 34Recovery of costs of new connections
- Part 6: MISCELLANEOUS AND GENERAL
- 35Benefit of the Order
- 36Consent to transfer the benefit of the Order
- 37Application of landlord and tenant law
- 38Operational land for the purposes of the 1990 Act
- 39Felling or lopping of trees and removal of hedgerows
- 40Trees subject to tree preservation orders
- 41Certification of plans and documents, etc.
- 42No double recovery
- 43Arbitration
- 44Protective provisions
- 45Service of notices
- 46Procedure in relation to certain approvals etc.
- 47Guarantees in respect of payment of compensation
- 48Compulsory acquisition of land – incorporation of the mineral code
- 49Crown rights
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT
- 1Interpretation
- 2Authorised Development
- Schedule 2: REQUIREMENTS
- 1Interpretation
- 2Commencement of the authorised development
- 3Approved details and amendments to them
- 4Community liaison group
- 5Detailed design approval
- 6Battery safety management
- 7Landscape and ecological management plan
- 8Biodiversity net gain
- 9Fencing and other means of enclosure
- 10Surface and foul water drainage
- 11Archaeology
- 12Construction environmental management plan
- 13Operational environmental management plan
- 14Waste management plan
- 15Construction traffic management plan
- 16Permissive path
- 17Public rights of way
- 18Operational noise
- 19Soil management
- 20Skills, supply chain and employment
- 21Decommissioning and restoration
- Schedule 3: LEGISLATION TO BE DISAPPLIED
- 1Paragraph 1
- Schedule 4STREETS SUBJECT TO STREET WORKS
- Schedule 5: ALTERATION OF STREETS
- 1PERMANENT ALTERATION OF LAYOUT
- 2TEMPORARY ALTERATION OF LAYOUT
- Schedule 6: STREETS AND PUBLIC RIGHTS OF WAY
- 1TEMPORARY PROHIBITION OR RESTRICTION OF THE USE OF STREETS
- 2TEMPORARY PROHIBITION OR RESTRICTION OF PUBLIC RIGHTS OF WAY WITH DIVERSION
- 3PERMANENT USE OF MOTOR VEHICLES ON PUBLIC RIGHT OF WAY
- 4TEMPORARY MANAGEMENT OF PUBLIC RIGHTS OF WAY
- 5TEMPORARY USE OF MOTOR VEHICLES ON PUBLIC RIGHTS OF WAY
- Schedule 7: ACCESS TO WORKS
- 1PERMANENT MEANS OF ACCESS TO WORKS
- 2TEMPORARY MEANS OF ACCESS TO WORKS
- Schedule 8TRAFFIC REGULATION MEASURES
- Schedule 9: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- 1Interpretation
- Schedule 10: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
- 1Compensation enactments
- 2Paragraph 2
- 3Paragraph 3
- 4Application of Part 1 of the 1965 Act
- 5Paragraph 5
- Schedule 11LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 12: HEDGEROWS TO BE REMOVED
- 1IMPORTANT HEDGEROWS WHICH REQUIRE REMOVAL
- 2HEDGEROWS WHICH REQUIRE REMOVAL
- Schedule 13DOCUMENTS AND PLANS TO BE CERTIFIED
- Schedule 14: ARBITRATION RULES
- 1Commencing an arbitration
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- Schedule 15: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- Part 3: FOR THE PROTECTION OF DRAINAGE AUTHORITIES
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- Part 4: FOR THE PROTECTION OF THE CANAL & RIVER TRUST
- 27Interpretation
- 28Powers requiring the Canal & River Trust’s consent
- 29Fencing
- 30Survey of waterway
- 31Approval of plans, protective works etc.
- 32Design of works
- 33Notice of works
- 34Construction of specified works
- 35Prevention of pollution
- 36Access to work – provision of information
- 37Alterations to the waterway
- 38Repayment of the Canal & River Trust’s fees, etc.
- 39Making good of detriment; compensation and indemnity, etc.
- 40Arbitration
- 41Capitalised sums
- 42As built drawings
- 43Decommissioning
- Part 5: FOR THE PROTECTION OF COTTAM SOLAR PROJECT LIMITED
- 44Paragraph 44
- 45Paragraph 45
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- 57Paragraph 57
- 58Paragraph 58
- 59Paragraph 59
- Part 6: FOR THE PROTECTION OF GATE BURTON ENERGY PARK LIMITED
- 60Paragraph 60
- 61Paragraph 61
- 62Paragraph 62
- 63Paragraph 63
- 64Paragraph 64
- 65Paragraph 65
- 66Paragraph 66
- 67Paragraph 67
- 68Paragraph 68
- 69Paragraph 69
- 70Paragraph 70
- 71Paragraph 71
- 72Paragraph 72
- 73Paragraph 73
- 74Paragraph 74
- 75Paragraph 75
- Part 7: FOR THE PROTECTION OF WEST BURTON SOLAR PROJECT LIMITED
- 76Paragraph 76
- 77Paragraph 77
- 78Paragraph 78
- 79Paragraph 79
- 80Paragraph 80
- 81Paragraph 81
- 82Paragraph 82
- 83Paragraph 83
- 84Paragraph 84
- 85Paragraph 85
- 86Paragraph 86
- 87Paragraph 87
- 88Paragraph 88
- 89Paragraph 89
- 90Paragraph 90
- 91Paragraph 91
- Part 8: FOR THE PROTECTION OF LINCOLNSHIRE FIRE AND RESCUE
- 92Interpretation
- 93Paragraph 93
- 94Costs
- Part 9: FOR THE PROTECTION OF CADENT GAS LIMITED
- 95Application
- 96Interpretation
- 97On street apparatus
- 98Apparatus of Cadent where there is a temporary prohibition or restriction on the use of streets and public rights of way
- 99Protective works to buildings
- 100Acquisition of land
- 101Removal of apparatus
- 102Facilities and rights for alternative apparatus
- 103Retained apparatus: protection of Cadent
- 104Expenses
- 105Indemnity
- 106Enactment and agreements
- 107Co-operation
- 108Access
- 109Arbitration
- 110Notices
- Part 10: FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
- 111Paragraph 111
- 112Submission and approval of plans
- 113Construction of protective works
- 114Timing of works and service of notices
- 115Works not in accordance with this Schedule
- 116Maintenance of works
- 117Remediating impaired drainage work
- 118Agency access
- 119Free passage of fish
- 120Indemnity
- 121Paragraph 121
- 122Disputes
- Part 11: FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC
- 123Paragraph 123
- 124Paragraph 124
- 125Paragraph 125
- 126Paragraph 126
- 127Paragraph 127
- 128Paragraph 128
- 129Paragraph 129
- 130Paragraph 130
- 131Paragraph 131
- 132Paragraph 132
- 133Paragraph 133
- 134Paragraph 134
- 135Paragraph 135
- 136Paragraph 136
- 137Paragraph 137
- 138Paragraph 138
- 139Paragraph 139
- Part 12: FOR THE PROTECTION OF RAILWAY INTERESTS
- 140Paragraph 140
- 141Paragraph 141
- 142Paragraph 142
- 143Paragraph 143
- 144Paragraph 144
- 145Paragraph 145
- 146Paragraph 146
- 147Paragraph 147
- 148Paragraph 148
- 149Paragraph 149
- 150Paragraph 150
- 151Paragraph 151
- 152Paragraph 152
- 153Paragraph 153
- 154Paragraph 154
- 155Paragraph 155
- 156Paragraph 156
- 157Paragraph 157
- 158Paragraph 158
- 159Paragraph 159
- 160Paragraph 160
- 161Paragraph 161
- Part 13: FOR THE PROTECTION OF ANGLIAN WATER SERVICES LIMITED
- 162Application
- 163Interpretation
- 164On street apparatus
- 165Apparatus in streets subject to temporary prohibitions or restrictions
- 166Protective works to buildings
- 167Acquisition of apparatus
- 168Removal of apparatus
- 169Facilities and rights for alternative apparatus
- 170Retained apparatus
- 171Expenses and costs
- 172Paragraph 172
- 173Cooperation
- 174Paragraph 174
- 175Paragraph 175
- 176Paragraph 176
- Part 14: FOR THE PROTECTION OF UNIPER
- 177Paragraph 177
- 178Paragraph 178
- 179Paragraph 179
- 180Apparatus of Uniper in streets and public rights of way
- 181Protective works to buildings
- 182Acquisition of land
- 183Retained apparatus
- 184Removal or replacement of apparatus
- 185Expenses
- 186Indemnity
- 187Co-operation
- 188Access
- 189Confidentiality
- 190Arbitration
- 191Notices
- Part 15: FOR THE PROTECTION OF EXOLUM PIPELINE SYSTEM LIMITED
- 192Application
- 193Interpretation
- 194Acquisition of apparatus
- 195Paragraph 195
- 196Paragraph 196
- 197Paragraph 197
- 198Removal of apparatus and rights for alternative apparatus
- 199Paragraph 199
- 200Paragraph 200
- 201Paragraph 201
- 202Paragraph 202
- 203Paragraph 203
- 204Paragraph 204
- 205Paragraph 205
- 206Facilities and rights for alternative apparatus
- 207Paragraph 207
- 208Paragraph 208
- 209Paragraph 209
- 210Paragraph 210
- 211Retained apparatus and alternative apparatus: protection
- 212Paragraph 212
- 213Paragraph 213
- 214Paragraph 214
- 215Paragraph 215
- 216Paragraph 216
- 217Paragraph 217
- 218Paragraph 218
- 219Paragraph 219
- 220Paragraph 220
- 221Cathodic protection testing
- 222Paragraph 222
- 223Expenses
- 224Paragraph 224
- 225Paragraph 225
- 226Damage to property and other losses
- 227Paragraph 227
- 228Paragraph 228
- 229Paragraph 229
- 230Paragraph 230
- 231Paragraph 231
- 232Paragraph 232
- 233Insurance
- 234Paragraph 234
- 235Co-operation and reasonableness
- 236Paragraph 236
- 237Paragraph 237
- 238Emergency circumstances
- 239Paragraph 239
- 240Paragraph 240
- 241Paragraph 241
- 242Dispute resolution
- 243Paragraph 243
- 244Paragraph 244
- 245Miscellaneous
- Part 16: FOR THE PROTECTION OF EDF ENERGY
- 246Application
- 247Interpretation
- 248On Street Apparatus
- 249Apparatus of EDF in streets and public rights of way
- 250Protective works to buildings
- 251Acquisition of land
- 252Removal of apparatus
- 253Facilities and rights for alternative apparatus
- 254Retained apparatus: protection
- 255Expenses
- 256Indemnity
- 257Enactments and agreements
- 258Co-operation
- 259Access
- 260Arbitration
- 261Notices
- Part 17: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER
- 262Application
- 263Interpretation
- 264On Street Apparatus
- 265Apparatus of National Grid Electricity Transmission Plc in streets subject to temporary prohibition or restriction of use and public rights of way
- 266Protective works to buildings
- 267Acquisition of land
- 268Removal of apparatus
- 269Facilities and rights for alternative apparatus
- 270Retained apparatus: protection of National Grid Electricity Transmission Plc as electricity undertaker
- 271Expenses
- 272Indemnity
- 273Enactments and agreements
- 274Co-operation
- 275Access
- 276Arbitration
- 277Notices
- Part 18: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC AS ELECTRICITY UNDERTAKER
- 278Application
- 279Interpretation
- 280Precedence of 1991 Act in respect of apparatus in streets
- 281Paragraph 281
- 282Removal of apparatus
- 283Facilities and rights for alternative apparatus
- 284Retained apparatus
- 285Expenses and costs
- 286Paragraph 286
- 287Expert determination
- Part 19: FOR THE PROTECTION OF TRENT VALLEY INTERNAL DRAINAGE BOARD
- 288Paragraph 288
- 289Paragraph 289
- 290Paragraph 290
- 291Paragraph 291
- 292Paragraph 292
- 293Paragraph 293
- 294Paragraph 294
- 295Paragraph 295
- 296Paragraph 296
- 297Paragraph 297
- Schedule 16: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 1Interpretation
- 2Applications made under requirement
- 3Further information and consultation
- 4Appeals
- 5Fees
- Explanatory note