OpenLegislation

Schedule 13 DOCUMENTS AND PLANS TO BE CERTIFIEDI1

England, Wales and Scotland

(1)

Document name

(2)

Document reference

(3)

Revision number

(4)

Date

Land and Crown Land PlansEN010142/APP/2.21September 2024
Works PlansEN010142/APP/2.34April 2025
Streets, Rights of Way and Access PlansEN010142/APP/2.43October 2024
Traffic Regulation Measures PlanEN010142/APP/2.53October 2024
Hedgerow Removal PlanEN010142/APP/2.91September 2024
Book of ReferenceEN010142/APP/4.35April 2025
Environmental Statement (other than those listed individually below)EN010142/APP/6.10April 2024
Environmental Statement Chapter 3: Scheme Description of the ESEN010142/APP/6.13January 2025
Environmental Statement Chapter 10: Water EnvironmentEN010142/APP/6.11December 2024
Environmental Statement Chapter 12: Landscape and Visual AssessmentEN010142/APP/6.12January 2025
Environmental Statement Chapter 13: Noise and VibrationEN010142/APP/6.11June 2024
Environmental Statement Chapter 18: Cumulative Effects and InteractionsEN010142/APP/6.14April 2025
Environmental Statement Chapter 19: Summary of Significant Environmental EffectsEN010142/APP/6.11December 2024
Technical Appendices (other than those listed individually below)EN010142/APP/6.20April 2024
Appendix 8-5-1: Principal Site Geophysical Report (Part 1)EN010142/APP/6.21June 2024
Appendix 8-5-2: Cable Route Corridor Geophysical Survey ReportEN010142/APP/6.21June 2024
Appendix 9-5: Baseline Report for Great Crested NewtsEN010142/APP/6.21June 2024
Appendix 9-12: Habitat Regulations Assessment ReportEN010142/APP/6.22December 2024
Appendix 10-3: Flood Risk AssessmentEN010142/APP/6.22January 2025
Appendix 10-4: Outline Drainage StrategyEN010142/APP/6.20April 2024
Appendix 12-6: LVIA Assessment of Visual EffectsEN010142/APP/6.21December 2024
Appendix 12-7: Arboricultural Impact Assessment Part 1, 2 and 3EN010142/APP/6.21April 2025
Appendix 13-4: Noise ModellingEN010142/APP/6.21June 2024
Figures (other than those listed individually below)EN010142/APP/6.30April 2024
Figure 2-2: Environmental Constraints PlanEN010142/APP/6.31June 2024
Figure 3-1: Indicative Principal Site Layout PlanEN010142/APP/6.32April 2025
Figure 3-7: Access LocationsEN010142/APP/6.31September 2024
Figure 3-12: Trenchless Crossing Cross SectionsEN010142/APP/6.31October 2024
Figure 4-2: Outcome of Planning and Environmental Constraints MappingEN010142/APP/6.31June 2024
Figure 4-3: Zones Suitable for Solar DevelopmentEN010142/APP/6.31June 2024
Figure 10-5: Watercourses, Flood Zones and Internal Drainage BoardsEN010142/APP/6.31October 2024
Figure 12-4: A-H Zones of Theoretical VisibilityEN010142/APP/6.31June 2024
Figure 12-5: Topography and WatercoursesEN010142/APP/6.31December 2024
Figure 12-7: Public Rights of WayEN010142/APP/6.31December 2024
Figure 12-11: Local Landscape Character Areas (Defined by the Applicant)EN010142/APP/6.31June 2024
Figure 12-13: Q-V Reference Viewpoint PhotographyEN010142/APP/6.30June 2024
Figure 12-13: W-CC Reference Viewpoint PhotographyEN010142/APP/6.30June 2024
Figure 13-2: Operational Noise ContoursEN010142/APP/6.31June 2024
Figure 16-3: Proposed HGV Routes – Principal Site and Cable Route CorridorEN010142/APP/6.31June 2024
Figure 16-4: Local Highway NetworkEN010142/APP/6.31June 2024
Figure 16-8: Selected Bus Stops and Routes F1Closest to the SchemeEN010142/APP/6.31June 2024
Figure 18-5: Transport Cumulative Traffic RoutesEN010142/APP/6.32February 2025
Outline Design Principles StatementEN010142/APP/7.43January 2025
Framework Construction Environmental Management PlanEN010142/APP/7.83February 2025
Framework Operational Environmental Management PlanEN010142/APP/7.94April 2025
Framework Decommissioning Environmental Management PlanEN010142/APP/7.103February 2025
Framework Construction Traffic Management PlanEN010142/APP/7.115February 2025
Framework Soil Management PlanEN010142/APP/7.122April 2025
Framework Battery Safety Management PlanEN010142/APP/7.131January 2025
Framework Public Rights of Way Management PlanEN010142/APP/7.161December 2024
Framework Landscape and Ecological Management PlanEN010142/APP/7.176April 2025
Framework Skills, Supply Chain and Employment PlanEN010142/APP/7.180April 2024
Archaeological Mitigation StrategyEN010142/APP/7.180October 2024

Annotations

Textual amendments

F1

Word in Sch. 13 substituted (30.4.2026) by The Tillbridge Solar (Correction) Order 2026 (S.I. 2026/487), art. 1, Sch.

Commencement

I1

Sch. 13 in force at 5.11.2025, see art. 1