Schedule 13 DOCUMENTS AND PLANS TO BE CERTIFIEDI1
England, Wales and Scotland
(1) Document name | (2) Document reference | (3) Revision number | (4) Date |
|---|---|---|---|
| Land and Crown Land Plans | EN010142/APP/2.2 | 1 | September 2024 |
| Works Plans | EN010142/APP/2.3 | 4 | April 2025 |
| Streets, Rights of Way and Access Plans | EN010142/APP/2.4 | 3 | October 2024 |
| Traffic Regulation Measures Plan | EN010142/APP/2.5 | 3 | October 2024 |
| Hedgerow Removal Plan | EN010142/APP/2.9 | 1 | September 2024 |
| Book of Reference | EN010142/APP/4.3 | 5 | April 2025 |
| Environmental Statement (other than those listed individually below) | EN010142/APP/6.1 | 0 | April 2024 |
| Environmental Statement Chapter 3: Scheme Description of the ES | EN010142/APP/6.1 | 3 | January 2025 |
| Environmental Statement Chapter 10: Water Environment | EN010142/APP/6.1 | 1 | December 2024 |
| Environmental Statement Chapter 12: Landscape and Visual Assessment | EN010142/APP/6.1 | 2 | January 2025 |
| Environmental Statement Chapter 13: Noise and Vibration | EN010142/APP/6.1 | 1 | June 2024 |
| Environmental Statement Chapter 18: Cumulative Effects and Interactions | EN010142/APP/6.1 | 4 | April 2025 |
| Environmental Statement Chapter 19: Summary of Significant Environmental Effects | EN010142/APP/6.1 | 1 | December 2024 |
| Technical Appendices (other than those listed individually below) | EN010142/APP/6.2 | 0 | April 2024 |
| Appendix 8-5-1: Principal Site Geophysical Report (Part 1) | EN010142/APP/6.2 | 1 | June 2024 |
| Appendix 8-5-2: Cable Route Corridor Geophysical Survey Report | EN010142/APP/6.2 | 1 | June 2024 |
| Appendix 9-5: Baseline Report for Great Crested Newts | EN010142/APP/6.2 | 1 | June 2024 |
| Appendix 9-12: Habitat Regulations Assessment Report | EN010142/APP/6.2 | 2 | December 2024 |
| Appendix 10-3: Flood Risk Assessment | EN010142/APP/6.2 | 2 | January 2025 |
| Appendix 10-4: Outline Drainage Strategy | EN010142/APP/6.2 | 0 | April 2024 |
| Appendix 12-6: LVIA Assessment of Visual Effects | EN010142/APP/6.2 | 1 | December 2024 |
| Appendix 12-7: Arboricultural Impact Assessment Part 1, 2 and 3 | EN010142/APP/6.2 | 1 | April 2025 |
| Appendix 13-4: Noise Modelling | EN010142/APP/6.2 | 1 | June 2024 |
| Figures (other than those listed individually below) | EN010142/APP/6.3 | 0 | April 2024 |
| Figure 2-2: Environmental Constraints Plan | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 3-1: Indicative Principal Site Layout Plan | EN010142/APP/6.3 | 2 | April 2025 |
| Figure 3-7: Access Locations | EN010142/APP/6.3 | 1 | September 2024 |
| Figure 3-12: Trenchless Crossing Cross Sections | EN010142/APP/6.3 | 1 | October 2024 |
| Figure 4-2: Outcome of Planning and Environmental Constraints Mapping | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 4-3: Zones Suitable for Solar Development | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 10-5: Watercourses, Flood Zones and Internal Drainage Boards | EN010142/APP/6.3 | 1 | October 2024 |
| Figure 12-4: A-H Zones of Theoretical Visibility | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 12-5: Topography and Watercourses | EN010142/APP/6.3 | 1 | December 2024 |
| Figure 12-7: Public Rights of Way | EN010142/APP/6.3 | 1 | December 2024 |
| Figure 12-11: Local Landscape Character Areas (Defined by the Applicant) | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 12-13: Q-V Reference Viewpoint Photography | EN010142/APP/6.3 | 0 | June 2024 |
| Figure 12-13: W-CC Reference Viewpoint Photography | EN010142/APP/6.3 | 0 | June 2024 |
| Figure 13-2: Operational Noise Contours | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 16-3: Proposed HGV Routes – Principal Site and Cable Route Corridor | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 16-4: Local Highway Network | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 16-8: Selected Bus Stops and Routes F1Closest to the Scheme | EN010142/APP/6.3 | 1 | June 2024 |
| Figure 18-5: Transport Cumulative Traffic Routes | EN010142/APP/6.3 | 2 | February 2025 |
| Outline Design Principles Statement | EN010142/APP/7.4 | 3 | January 2025 |
| Framework Construction Environmental Management Plan | EN010142/APP/7.8 | 3 | February 2025 |
| Framework Operational Environmental Management Plan | EN010142/APP/7.9 | 4 | April 2025 |
| Framework Decommissioning Environmental Management Plan | EN010142/APP/7.10 | 3 | February 2025 |
| Framework Construction Traffic Management Plan | EN010142/APP/7.11 | 5 | February 2025 |
| Framework Soil Management Plan | EN010142/APP/7.12 | 2 | April 2025 |
| Framework Battery Safety Management Plan | EN010142/APP/7.13 | 1 | January 2025 |
| Framework Public Rights of Way Management Plan | EN010142/APP/7.16 | 1 | December 2024 |
| Framework Landscape and Ecological Management Plan | EN010142/APP/7.17 | 6 | April 2025 |
| Framework Skills, Supply Chain and Employment Plan | EN010142/APP/7.18 | 0 | April 2024 |
| Archaeological Mitigation Strategy | EN010142/APP/7.18 | 0 | October 2024 |