Development on any land during a period not exceeding 28 consecutive days consisting of–

(a)

the drilling of boreholes;

(b)

the carrying out of seismic surveys; or

(c)

the making of other excavations,

for the purpose of mineral exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations.

Annotations

Textual amendments

F1

Order revoked (E.) (15.4.2015) by The Town and Country Planning (General Permitted Development) (England) Order 2015 (S.I. 2015/596), art. 1(1), Sch. 4 para. 1 (with arts. 1(2), 8(2)(3))