Paragraph A.1 Development not permittedF1
Development is not permitted by Class A if–
it consists of the drilling of boreholes for petroleum exploration;
any operation would be carried out within 50 metres of any part of an occupied residential building or a building occupied as a hospital or school;
any operation would be carried out within a National Park, an area of outstanding natural beauty, a site of archaeological interest or a site of special scientific interest;
any explosive charge of more than 1 kilogram would be used;
any excavation referred to in paragraph A(c) would exceed 10 metres in depth or 12 square metres in surface area;
in the case described in paragraph A(c) more than 10 excavations would, as a result, be made within any area of 1 hectare within the land during any period of 24 months; or
any structure assembled or provided would exceed 12 metres in height, or, where the structure would be within 3 kilometres of the perimeter of an aerodrome, 3 metres in height.
Annotations
Textual amendments
- F1
Order revoked (E.) (15.4.2015) by The Town and Country Planning (General Permitted Development) (England) Order 2015 (S.I. 2015/596), art. 1(1), Sch. 4 para. 1 (with arts. 1(2), 8(2)(3))