Paragraph 44 Development at an airport
Scotland
The carrying out on operational land by a relevant airport operator or its agent of development (including the erection or alteration of an operational building) in connection with the provision of services and facilities at a relevant airport.
Development is not permitted by this class if it would consist of or include—
the construction or extension of a runway;
the erection of a building other than an operational building;
the alteration or reconstruction of a building other than an operational building, where its design or external appearance would be materially affected.
Development is permitted by this class subject to the condition that the relevant airport operator shall consult the planning authority before carrying out any development, unless that development falls within the description in sub-paragraph (4).
Development falls within this sub-paragraph if—
it is urgently required for the efficient running of the airport; and
it consists of the carrying out of works, or the erection or construction of a structure or of an ancillary building, or the placing on land of equipment, and the works, structure, building, or equipment do not exceed 4 metres in height or 200 cubic metres in capacity.