Schedule 1 SCHEDULED WORKSI1
England and Wales
(1) Number of Work | (2) Description of Work |
|---|---|
| Work No. 1 | A tramroad / tramway 317 metres in length (multiple line), commencing at the junction of Lower Mosley Street / Windmill Street and running northeast along Lower Mosley Street, crossing Peter Street to run through St Peter’s Square. The work continues in a northeasterly direction terminating at the rear of the footway flanking Princess Street. |
| Work No. 2 | A tramway 577 metres in length (double line), commencing at the termination of Work No. 1 running northwest within the carriageway of Princess Street before turning into Cross Street to run in a northeasterly direction within the carriageway of Cross Street and Corporation Street, terminating 16 metres north of the junction of Corporation Street and Market Street. |
| Work No. 3 | A tramway 392 metres in length (double line), commencing at the termination of Work No. 2 and running northeast within the carriageway of Corporation Street, leaving the highway at the Corporation Street / Balloon Street junction to join the existing Metrolink lines and terminating at the rear of the footway flanking Corporation Street. |
Annotations
Commencement
- I1
Sch. 1 in force at 6.11.2013, see art. 1