OpenLegislation

Schedule 1 SCHEDULED WORKSI1

England and Wales

(1)

Number of Work

(2)

Description of Work

Work No. 1A tramroad / tramway 317 metres in length (multiple line), commencing at the junction of Lower Mosley Street / Windmill Street and running northeast along Lower Mosley Street, crossing Peter Street to run through St Peter’s Square. The work continues in a northeasterly direction terminating at the rear of the footway flanking Princess Street.
Work No. 2A tramway 577 metres in length (double line), commencing at the termination of Work No. 1 running northwest within the carriageway of Princess Street before turning into Cross Street to run in a northeasterly direction within the carriageway of Cross Street and Corporation Street, terminating 16 metres north of the junction of Corporation Street and Market Street.
Work No. 3A tramway 392 metres in length (double line), commencing at the termination of Work No. 2 and running northeast within the carriageway of Corporation Street, leaving the highway at the Corporation Street / Balloon Street junction to join the existing Metrolink lines and terminating at the rear of the footway flanking Corporation Street.

Annotations

Commencement

I1

Sch. 1 in force at 6.11.2013, see art. 1