Part 1 Authorised DevelopmentI1
England, Wales and Scotland
A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act on the bed of the North Sea approximately 33 kilometres off the coast of Lincolnshire and 46 kilometres off the coast of North Norfolk within the Renewable Energy Zone, comprising—
Work No. 1 — an offshore wind turbine generating station with a gross electrical output capacity of up to F1900 MW comprising up to F290 wind turbine generators each fixed to the seabed by one of five foundation types (namely, monopile, jacket, tripod, suction bucket monopod or gravity base foundation), fitted with rotating blades and situated within the coordinates for the Order limits shown on the Works plan and specified below, and including the further works comprising (a) to (c) below;
Coordinates for the Order limits (Datum: WGS 84)
Point Latitude (DMS) Longitude (DMS) Point Latitude (DMS) Longitude (DMS) 1 53° 29′ 12.732″ N 0° 41′ 28.839″ E 2 53° 31′ 42.626″ N 0° 42′ 58.367″ E 3 53° 32′ 16.234″ N 0° 51′ 40.692″ E 4 53° 24′ 31.248″ N 0° 59′ 39.385″ E 5 53° 24′ 31.234″ N 0° 56′ 1.766″ E - (a)
up to F32 collector substations fixed to the seabed by jacket or monopile foundations within the Order limits;
- (b)
F4...
- (c)
a network of cables laid underground within the Order limits between the wind turbine generators F5and any collector substation for the transmission of electricity and electronic communications between these different structures, including one or more cable crossings;
F6...
- (a)
F7...
and in connection with such F8Work No. 1, and to the extent that they do not otherwise form part of any such work, F9... associated development within the Order limits comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the work assessed by the environmental statement.
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(2)
- F2
Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(3)
- F3
Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(4)
- F4
Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(5)
- F5
Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(6)
- F6
Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(7)(a)
- F7
Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(7)(b)
- F8
Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(8)
- F9
Word in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(9)
Commencement
- I1
Sch. 1 Pt. 1 in force at 12.7.2013, see art. 1