Paragraph 4 Installation of heat pumpsF1F2
For the purposes of item 1, “installing energy-saving materials” includes carrying out groundworks, or dredging a body of water, in order to install pipework or other equipment necessary for the operation of a ground source heat pump or a water source heat pump.
Annotations
Textual amendments
- F1
Sch. 8 Pt. 2 Group 9 item 1 substituted (6.4.2013) by Finance Act 2012 (c. 14), Sch. 26 paras. 4(2), 7(2)
- F2
Sch. 8 Pt. 2 Group 23 Notes paras. 4, 5 and cross-headings inserted (1.2.2024) by The Value Added Tax (Installation of Energy-Saving Materials) Order 2024 (S.I. 2024/24), arts. 1(2), 3(4)
Notes on Part II
Modifications
- C1
Sch. 8 Pt. 2 modified (temp. until 31.3.2027) (1.10.2026) by The Value Added Tax (Supplies of Domestic Electricity) Order 2026 (S.I. 2026/987), arts. 1(1), 3(3) (with art. 1(2))
Notes on Chapter GROUP 23
Textual amendments
- F2
Sch. 8 Pt. 2 Group 23 inserted (1.4.2022) by The Value Added Tax (Installation of Energy-Saving Materials) Order 2022 (S.I. 2022/361), arts. 2, 7(3)
- F3
Words in Sch. 8 Pt. 2 Group 23 heading inserted (1.5.2023) by The Value Added Tax (Installation of Energy-Saving Materials) Order 2023 (S.I. 2023/376), arts. 1, 3(3)(a)
Notes on Item No
Textual amendments
- F2
Sch. 8 Pt. 2 Group 23 inserted (1.4.2022) by The Value Added Tax (Installation of Energy-Saving Materials) Order 2022 (S.I. 2022/361), arts. 2, 7(3)