Paragraph 5 Detailed offshore design parametersI1
England and Wales
The total number of F1monopile foundations forming part of the authorised development shall not exceed 207 and no monopile foundation for use with any wind turbine generator or offshore substation forming part of the authorised development shall have a diameter greater than 9 metres.
No jacket structure for use with any wind turbine generator forming part of the authorised development shall have—
a width spacing between each leg at the level of the seabed of more than 40 metres and at the level of LAT which is greater than 20 metres;
more than four legs;
a leg diameter of more than 3 metres;
more than one pile per leg;
a pile diameter of more than 3 metres;
more than one suction caisson per leg;
a suction caisson diameter of greater than 10 metres.
No jacket structure for use with any offshore substation forming part of the authorised development, when used in conjunction with steel piles or suction caissons, shall have—
a width spacing between each leg at the level of the seabed of more than 70 metres and at the level of LAT which is greater than 40 metres;
more than 4 legs;
a leg diameter of more than 4 metres;
more than four piles per leg;
a pile diameter of more than 3.5 metres;
more than three suction caissons per leg;
a suction caisson diameter of greater than 25 metres each.
Annotations
Textual amendments
- F1
Word in Sch. 1 Pt. 3 para. 5 substituted (25.4.2015) by The Walney Extension Offshore Wind Farm (Correction) Order 2015 (S.I. 2015/1270), art. 1, Sch.
Commencement
- I1
Sch. 1 Pt. 3 para. 5 in force at 28.11.2014, see art. 1