Part 3 Requirements
England and Wales
- 1Time limits
- 2Detailed offshore design parameters
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Detailed offshore design parameters
- 6Detailed offshore design parameters
- 7Detailed offshore design parameters
- 8Detailed offshore design parameters
- 9Detailed offshore design parameters
- 10Detailed offshore design parameters
- 11Detailed offshore design parameters
- 12Air traffic services at Warton Aerodrome
- 13Primary surveillance radars at St Annes and Lowther Hill
- 14Offshore decommissioning
- 15Stages of authorised development onshore
- 16Detailed design approval onshore
- 17Detailed design approval onshore
- 18Provision of landscaping
- 19Implementation and maintenance of landscaping
- 20Highway accesses
- 21Public Access Strategy
- 22Public rights of way
- 23Fencing and other means of enclosure
- 24Surface and foul water drainage
- 25Contaminated land and contaminated groundwater
- 26Archaeology onshore
- 27Code of Construction Practice (CoCP)
- 28Construction and environmental management plan
- 29Emergency response plan
- 30European protected species
- 31Construction Traffic Management Plan
- 32Port Construction Traffic Management Plan (Port CTMP)
- 33Construction hours
- 34Control of noise during construction
- 35Control of noise during operational phase
- 36Control of air quality
- 37Control of artificial light emissions
- 38Flood risk
- 39Restoration of land used temporarily for construction
- 40Onshore decommissioning
- 41Requirement for written approval
- 42Amendments to approved details