Paragraph 8 Detailed offshore design parametersI1
England and Wales
The total volume of cable protection (excluding cable crossings) included within Work No. 1(b) shall not exceed 27,000m³ with a maximum footprint of 35,000m².
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 8 in force at 28.11.2014, see art. 1