Paragraph 9 Detailed offshore design parametersI1
England and Wales
The total volume of cable protection associated with cable crossings included within Work No. 1(b) shall not exceed 64,328m³ with a maximum footprint of 74,480m².
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 9 in force at 28.11.2014, see art. 1