Paragraph 10 Detailed offshore design parametersI1
England and Wales
The total volume of cable protection (excluding cable crossings) for Work No. 3A shall not exceed 109,650m³ with a maximum footprint of 142,139m².
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 10 in force at 28.11.2014, see art. 1