Paragraph 11 Detailed offshore design parametersI1
England and Wales
The total volume of cable protection associated with cable crossings included within Work No. 3A shall not exceed 125,955m³ with a maximum footprint of 144,548m².
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 11 in force at 28.11.2014, see art. 1