Section 17D The threshold requirementF1
England and Wales
The requirement is that, at the time when the F4water supply licensee first enters into an undertaking with a customer to give the supply, the total quantity of water estimated to be supplied to the premises annually pursuant to the undertaking F5is not less than—
5 megalitres, in the case of premises supplied with water using the supply system of a water undertaker whose area is wholly or mainly in England, and
50 megalitres, in the case of premises supplied with water using the supply system of a water undertaker whose area is wholly or mainly in Wales.
Any guidance issued under subsection (3) above may, in particular—
specify—
the factors to be, and not to be, taken into account;
the assumptions to be made; and
the method of calculation to be employed,
in making estimates; and
make provision as to the commencement of the annual periods by reference to which estimates are to be made.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Regulations under subsection (8) above—
shall include provision for the amendment made by the regulations not to apply in relation to any undertaking entered into before the date on which the regulations come into force; and
may include provision for that amendment not to apply in relation to any undertaking which is proposed, but not entered into, before that date.
A statutory instrument containing regulations under subsection (8) above shall not be made unless a draft of the instrument has been laid before, and approved by a resolution of, F15the Assembly.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Annotations
Textual amendments
- F1
Pt. 2 Ch. 1A inserted (1.4.2004 for specified provisions and purposes and 1.8.2005 for further specified provisions and purposes and 1.10.2005 for further specified provisions and 1.12.2005 otherwise) by Water Act 2003 (c. 37), ss. 56, 105(3), Sch. 4 para. 2; S.I. 2004/641, art. 3(l), Sch. 1 (with art. 6, Sch. 3); S.I. 2005/968, art. 3(b) (with savings in art. 4, Sch. 1, 2); S.I. 2005/2714, arts. 2(h), 3(a) (with Sch. para. 5)
- F2
Words in s. 17D(1) substituted (1.1.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(2)(a); S.I. 2015/1938, art. 3(f)(ii) (with art. 4)
- F3
Words in s. 17D(1) inserted (1.1.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(2)(b); S.I. 2015/1938, art. 3(f)(ii) (with art. 4)
- F4
Words in s. 17D(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(g) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
- F5
Words in s. 17D(2) substituted (15.12.2011) by The Water Supply (Amendment to the Threshold Requirement) Regulations 2011 (S.I. 2011/3014), regs. 1(1), 2 (with reg. 1(2))
- F6
Words in s. 17D(3) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(4)(a); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F7
Words in s. 17D(3) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(4)(b); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F8
S. 17D(5) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(5); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F9
S. 17D(6) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(6); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F10
Words in s. 17D(7) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(7)(a); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F11
Words in s. 17D(7) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(7)(b); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F12
Words in s. 17D(7) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(7)(c); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F13
Words in s. 17D(8) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(8)(a); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F14
Words in s. 17D(8) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(8)(b); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F15
Words in s. 17D(10) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(9); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F16
Words in s. 17D(11) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(10)(a); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F17
Words in s. 17D(11) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(10)(b); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F18
S. 17D(12) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(11); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
- F19
S. 17D(13) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 12(11); S.I. 2017/462, art. 3(k)(iv) (with art. 11)
Notes on Chapter 1A
Textual amendments
- F2
Pt. 2 Ch. 1A heading substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 9; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Modifications
- C1
Pt. 2 Ch. 1A applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 3(1) (with reg. 1(1)(c))
- C2
Pt. 2 Ch. 1A applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 5(1) (with reg. 1(1)(c))
- C3
Pt. 2 Ch. 1A applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 4 (with reg. 1(1)(c)) (as amended (10.1.2015) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) (Amendment) Regulations 2015 (S.I. 2015/22), regs. 1(1), 3)
- C4
Pt. 2 Ch. 1A modified (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 3(2) (with reg. 1(1)(c))