Paragraph
Railway between Hazelbank Quarry and Stow—
Work No. 7—A railway (7,000 metres in length) commencing by a junction with Work No. 6 at its termination, passing over the course of the former Waverley railway and terminating at a point 158 metres north-west of the bridge carrying Station Road over the former railway at Stow. Work No. 7 includes a new culvert with track at Fountainhall to carry Still Burn under the intended railway; the reconstruction of Plenploth North, Torquhan South and Watherston bridges to carry the intended railway over Gala Water; the replacement of the decking of the culvert carrying a cattle creep and drain under the railway at Pirn and the culvert carrying Dean Burn under the railway at Watherston; the reconstruction of Craigbank Cattle Creep and of Watherston Dry Underbridge carrying the intended railway over the access track between the A7 road and Watherston Farm at The Craigs Wood; and the replacement of the decking of the bridge to carry the intended railway over Gala Water at Galabank.
Work No. 7A—A road commencing by a junction with the Fountainhall branch of the C11 road at a point 210 metres north-west of the junction of that branch road with Old Stage Road (C11) and terminating by a junction with the A7 road at a point 86 metres north-west of the junction of the Fountainhall branch of the C11 with the A7 road. Work No. 7A includes a bridge over the intended railway (Work No. 7) and earthworks for a visibility splay at its junction with the A7.
Work No. 7B—An access road commencing by a junction with Work No. 7A at a point 100 metres south-west of the junction of the Fountainhall branch of the C11 with the A7 road and terminating by a junction with the private road leading to Allanshaugh at a point 187 metres north-east of the junction of that road with Old Stage Road (C11).