Paragraph

Railway between Stow and Bowland Bridge—

  • Work No. 8—A railway (5,400 metres in length) commencing by a junction with Work No. 7 at its termination, passing over the course of the former Waverley railway, through the existing Bowshank Tunnel and terminating at a point 216 metres south-east of the bridge (Bowland Bridge) carrying the former railway over the Caddonfoot to Bowland road (B710). Work No. 8 includes a station at Stow; the replacement of the decking of the bridges carrying the intended railway over Lugate Water and Ferniehirst Dry; the replacement of the decking of Ferniehirst Water and Bowshank South bridges carrying the intended railway over Gala Water and the bridge (Bowland Bridge) carrying the intended railway over the Caddonfoot to Bowland road (B710); the replacement of the decking of the sheep and cattle creeps under the intended railway at Lugate Dry, Ferniehirst Dry and Bow Bridge; the improvement of Bowshank Tunnel; and the removal of Bowshank Farm Bridge over the intended railway.

  • Work No. 8A—A realignment of the Bow branch of the C11 road between a point 130 metres south-west of the junction of that branch road with the A7 road and a point 130 metres north-east of the junction of that branch road with Old Stage Road (C11). Work No. 8A includes a bridge under the intended railway (Work No. 8).

  • Work No. 8B—A footbridge over the intended railway (Work No. 8) to provide access to the station at Stow.