The A5/A449 link road the general arrangement of which is shown on the highway general arrangement plans and bridge plans including—

(a)

footways and cycleways;

(b)

construction of a new three arm roundabout on the A5;

(c)

construction of a left in and left out junction with Harrisons Lane;

(d)

construction of a new four arm roundabout on the A449;

(e)

new bridges over the railway and canal as shown on the bridge plans;

(f)

works comprising the interface with Works Nos. 5 and 7;

(g)

removal of existing laybys on the A5;

(h)

closure of the existing accesses on the A5 as shown on the access and rights of way plans;

(i)

upgrading of existing footway on the north side of the A5 to a cycleway;

(j)

bus stops and bus laybys on the A5/A449 link road;

(k)

bus laybys on the A449;

(l)

removal of bridge over West Coast Main Line Loop railway;

(m)

street lighting;

(n)

construction of new maintenance access points to the rail lines on the east and west (the latter through the rail terminal) of the West Coast Main Line Loop railway;

(o)

drainage and attenuation structures;

(p)

diversion and culverting of the existing canal feeder drain; and

(q)

installation of new service crossings below the public highway.