OpenLegislation

Paragraph

The construction of a rail freight terminal, the general arrangement of which is shown on the rail terminal – illustrative expanded rail terminal layout plan, to connect with the rail infrastructure described in Works No. 1 including—

(a)

earthworks to achieve a terminal plateau;

(b)

access and circulation roads;

(c)

an intermodal rail freight loading/unloading terminal including—

(i)

rail sidings to load/unload freight;

(ii)

freight storage areas; and

(iii)

gantry cranes and reach stackers;

(d)

railtracks and associated rail infrastructure;

(e)

drainage and attenuation ponds;

(f)

security fencing;

(g)

cripple sidings, rail freight terminal refuelling and maintenance areas;

(h)

alteration of the existing rail infrastructure including signalling;

(i)

terminal entry and exit gates, loading lanes, internal roads, gatehouses and vehicle/cycle parking areas;

(j)

rail freight terminal gateway/office including staff and visitor welfare facilities;

(k)

storage and workshop buildings;

(l)

the removal and replacement of pipework and boreholes associated with the remediation strategy for the SI land;

(m)

works to accommodate removal of bridge over West Coast Main Line Loop railway; and

(n)

the stopping up of Gravelly Way.