| (1) Location | (2) Length |
|---|
| A5/A449 link road | Shown coloured pink between points marked A and B as shown on the speed limits plans (Document 2.12A). |
| Vicarage Road link | Shown coloured pink between points marked C and C1 as shown on the speed limits plans (Document 2.12A and 2.12B). |
| Private Estate Roads | Shown coloured orange between points C and D as shown on the speed limits plans (Document 2.12B). |
| Private Estate Roads | Shown coloured orange between points marked C2 and C3 as shown on the speed limits plans (Document 2.12B). |
| Private Estate Roads | Shown coloured orange between points marked C4 and C5 as shown on the speed limits plans (Document 2.12B). |
| Private Estate Roads | Shown coloured orange between points marked E and E1 as shown on the speed limits plans (Document 2.12B). |