OpenLegislation

Part 2 CLEARWAYS

(1) Location(2) Description(3) Inclusion prohibition of waiting on verges?(4) Event
A5/A449 link roadShown coloured pink between points A and B on the traffic regulation plans (Documents 2.11A and 2.11B).NoUpon the opening of the A5/A449 link road to public traffic as shown on the highway general arrangement plans (Documents 2.9C, 2.9D, 2.9H and 2.9G).
A5/A449 link roadShown with a dashed green line between points C and D on the traffic regulation plans (Documents 2.11A and 2.11B).YesUpon the opening of the A5/A449 link road to public traffic as shown on the highway general arrangement plans (Documents 2.9C, 2.9D, 2.9H and 2.9G).
A5/A449 link road roundabout with Vicarage Road linkShown coloured green between points E and F on the traffic regulation plans (Documents 2.11A and 2.11B).NoUpon the opening of the A5/A449 link road roundabout with Vicarage Road link to public traffic as shown on the highway general arrangement plans (Document 2.9H).
A5/A449 link road roundabout with Vicarage Road linkShown dashed green at between points G and H on the traffic regulation plans (Documents 2.11A and 2.11B).YesUpon the opening of the A5/A449 link road roundabout with Vicarage Road link to public traffic as shown on the highway general arrangement plans (Document 2.9H).
Vicarage Road RoundaboutShown coloured orange at point I on the traffic regulation plans (Document 2.11B).NoUpon the opening of the Vicarage Road roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9I).
Vicarage Road RoundaboutShown dashed green at point J on the traffic regulation plans (Document 2.11B).YesUpon the opening of the Vicarage Road roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9I).