Part 3 NO WAITING AT ANY TIME

(1) Location(2) Length(3) Event
Station Drive turning headBetween points K, L and M as shown with a dark blue line on the traffic regulation plans (Document 2.11C).Opening of the Station Drive turning head as shown on the highway general arrangement plans (Document 2.9A).
Bus stops on the A5/A449 link roadBetween points N and O and P and Q shown with a dark blue line on the traffic regulation plans (Documents 2.11A and 2.11B).Opening of the A5/A449 link road bus stops as shown on highway general arrangement plans (Documents 2.9D and 2.9H).
Bus stops on the A449Between points R and S and T and U shown with a yellow line on the traffic regulation plans (Documents 2.11A and 2.11C).Opening of the A449 roundabout as shown on the highway general arrangement plans (Document 2.9C).