Schedule 2 DOCUMENTS AND PLANS TO BE CERTIFIEDI1
England, Wales and Scotland
Table 1
(1) Document name | (2) Document reference | (3) Revision number | (4) Date |
|---|---|---|---|
| access rights of way plan | 2.4 | 2 | September 2016 |
| book of reference | 4.3 | 3 | January 2017 |
design objectives statement, contained within— | |||
| design and access statement | 5.3 | 0 | March 2016 |
| environmental statement, comprising— | |||
| Volume 1: Non-Technical Summary to Environmental Statement (English) | 6.1 | 0 | March 2016 |
| Volume 1: Non-Technical Summary to Environmental Statement (Welsh | 6.1 | 0 | March 2016 |
| Volume 2: Environmental Statement, Main Statement | 6.2 | 0 | March 2016 |
| Volume 3: Environmental Statement Figures | 6.3 | 0 | March 2016 |
| Volume 4: Environmental Statement Appendices, amended by: | 6.4 | 0 | March 2016 |
| Appendix 14.3: Drainage Strategy | 6.4.9 | 1 | November 2016 |
| Appendix 19.1: Draft Construction Environmental Management Plan | 6.4.11 | 2 | November 2016 |
| Addendum to Environmental Statement Cumulative Effects Assessment - Electrical Connection | 11.8 | 0 | September 2016 |
| illustrative landscape and ecological mitigation master plan | 2.9.7 (sheet 1 of 7) | 0 | March 2016 |
| land plans | 2.2 | 5 | January 2017 |
| works plan | 2.3 | 0 | March 2016 |
Annotations
Commencement
- I1
Sch. 2 in force at 8.8.2017, see art. 1