Article 39 Certification of plans etc.I1
England, Wales and Scotland
The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
the book of reference;
design principles statement;
the environmental statement, which includes within its appendices the following—
outline construction environment management plan;
outline landscape and ecological mitigation strategy;
outline surface water management plan;
flood consequences assessment;
outline drainage strategy;
outline construction traffic management plan;
outline construction staff travel plan;
outline lighting strategy;
the land plans;
the rights of way, streets and access plan; and
the works plans; and
hedgerow plan,
for certification that they are true copies of the documents referred to in this Order.
A plan or document so certified is to be admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Annotations
Commencement
- I1
Art. 39 in force at 10.10.2019, see art. 1