Paragraph 1 I1
England, Wales and Scotland
In this Schedule—
“environmental statement” means the statement submitted under regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009f1, together with the shadow Habitats Regulations Assessment report, statements of common ground concluded with Natural England, the MMO and the Environment Agency F1, any further environmental documents certified by the Secretary of State pursuant article 55A (certification of further environmental documents) and the following documents submitted by the undertaker and certified under article 55 (certification of plans etc)—
Reference Title EX 3.1 Able Humber Port Northern Area Planning Committee Meeting Notes Feb 2012 EX 7.7 AMEP Material Management Plan EX 7.8 Able Marine Energy Park Dredging Strategy EX 8.5 Validation of 3D Flow and Sediment Models used for Assessment of Impacts of AMEP on Fine Sediment Transport EX 8.6 Maintenance Dredge Variability EX 8.7A Modelling of Final Quay Design (Supplement to Annex 8.1 of the ES) EX 8.8 Update to Longer Term Morphology Predictions in the Region of the Centrica and E.ON intakes and outfalls EX 8.9 Historical Review of Morphological Change North of HIT (2001–2010) EX 8.10 Long-term Morphological Change at Embayment South of Quay EX 8.11 Water Framework Directive – Compensation Site EX 8.12 Water Framework Directive – Project Wide EX 8.12A Water Framework Directive EX 8.13 IOTA Dredge Appropriate Assessment EX 8.14 Hydraulic & Sediment Regime – Piled Structures EX 8.15 Effect of Moored Vessels on Flows EX 8.16 Chapter 8 Signposting Document EX 9.7 Assessment of the effects of relocations of the E.ON and Centrica outfalls on thermal recirculation EX 10.4 Effect of Dredged Material Disposal on 1) Subtidal and Intertidal Features and 2) Aquatic Ecology EX 10.5 Supporting Information on Harbour Porpoises in the Humber Estuary EX 10.6 Impact of Berthing Pocket Construction EX 10.7 Soft Start and Seals EX 10.8 Disposal Site Characterisation and Impact Assessment EX 10.9 Environmental Management and Monitoring Plan: 1. Marine Works (Draft) EX 11.14 Biotopes of the Intertidal and Subtidal Sediments around the AMEP site, in the Humber Estuary EX 11.16 Assessment Update for Breeding Birds EX 11.17 AMEP Vascular Plant Surveys EX 11.18 Sensitive Months for Birds Using Intertidal EX 11.19 AMEP Bat Surveys Supplementary Note EX 11.20 Draft Great Crested Newts Licence Application – acknowledgement of receipt EX 11.22 The Impact of SPMTs and Cranes on the Operational Buffer EX 11.23 Immediate Habitat Losses Within the Designated Site EX 11.24 Medium and Long Term Losses Within the Designated Site EX 11.26 Pumping Station EX 11.26A Water Vole Mitigation EX 11.27 Killingholme Phase 2 Survey EX 11.27A Breeding Bird Mitigation EX 11.28 Great Crested Newt Survey (2006) EX 11.29 Water Vole Survey (2009) EX 11.30 Location of Replacement Ponds for Great Crested Newts EX 11.31 M456 Invertebrate Survey EX 11.32 Draft Environmental Monitoring and Management Plan: 2. Terrestrial Habitat – Killingholme EX 11.33 In combination Effects on Curlew EX 13.2 Addendum to Flood Risk Assessment EX 14.4 Simulation Videos and Stills EX 15.3 A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit EX 15.4 A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit Designer’s Response EX 15.5 Additional Junction RSA EX 19.1 Lighting Lux Plans EX 20.3 Additional Landscape Masterplan EX 28.1 Compensation Site Interim Report on Detailed Design EX 28.2 Old Little Humber Farm: Wet Grassland Creation, Management and Monitoring Plan EX 28.3 Final Compensation Proposals, Parts 1–10 EX 31.5 Re-Use of In Situ Material at CCS (Inc. Cherry Cobb Sands Phase 2 Site Investigation) EX 31.5A Factual Report on Geo–Environmental Ground Investigation, Cherry Cobb Sands EX 34.2 An Assessment of Temporal Variation of Benthic Invertebrate Communities in the Humber Estuary EX 35.12 Farmland Disturbance at Cherry Cobb Sands EX 35.13 Badger Bait–Marking Survey EX 35.14 Cherry Cobb Sands Compensation Site: Bird Survey Results August 2010 to April 2011 EX 36.2 North Bank Flood Defence Crest Height EX 36.3 Residual Flood Risk to Property on North Bank EX 36.4 Embankment Inspection and Maintenance Report EX 44.1 Supplementary In-Combination Assessment EX 44.2 Addendum to EX 44.1 ; and
“the water framework directive” means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2010 establishing a framework for Community action in the field of water policyf2.
Annotations
Textual amendments
- F1
Words in Sch. 11 para. 1 inserted (14.5.2021) by The Able Marine Energy Park Development Consent (Amendment) Order 2021 (S.I. 2021/606), arts. 1, 2(4)
Commencement
- I1
Sch. 11 para. 1 in force at 29.10.2014, see Introductory Text
Footnotes
- f1
- f2
-
O.J. No L327, 22.12.2000, p. 1-73.