OpenLegislation

Paragraph 1 I1

England, Wales and Scotland

In this Schedule—

  • “environmental statement” means the statement submitted under regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009f1, together with the shadow Habitats Regulations Assessment report, statements of common ground concluded with Natural England, the MMO and the Environment Agency F1, any further environmental documents certified by the Secretary of State pursuant article 55A (certification of further environmental documents) and the following documents submitted by the undertaker and certified under article 55 (certification of plans etc)—

    ReferenceTitle
    EX 3.1Able Humber Port Northern Area Planning Committee Meeting Notes Feb 2012
    EX 7.7AMEP Material Management Plan
    EX 7.8Able Marine Energy Park Dredging Strategy
    EX 8.5Validation of 3D Flow and Sediment Models used for Assessment of Impacts of AMEP on Fine Sediment Transport
    EX 8.6Maintenance Dredge Variability
    EX 8.7AModelling of Final Quay Design (Supplement to Annex 8.1 of the ES)
    EX 8.8Update to Longer Term Morphology Predictions in the Region of the Centrica and E.ON intakes and outfalls
    EX 8.9Historical Review of Morphological Change North of HIT (2001–2010)
    EX 8.10Long-term Morphological Change at Embayment South of Quay
    EX 8.11Water Framework Directive – Compensation Site
    EX 8.12Water Framework Directive – Project Wide
    EX 8.12AWater Framework Directive
    EX 8.13IOTA Dredge Appropriate Assessment
    EX 8.14Hydraulic & Sediment Regime – Piled Structures
    EX 8.15Effect of Moored Vessels on Flows
    EX 8.16Chapter 8 Signposting Document
    EX 9.7Assessment of the effects of relocations of the E.ON and Centrica outfalls on thermal recirculation
    EX 10.4Effect of Dredged Material Disposal on 1) Subtidal and Intertidal Features and 2) Aquatic Ecology
    EX 10.5Supporting Information on Harbour Porpoises in the Humber Estuary
    EX 10.6Impact of Berthing Pocket Construction
    EX 10.7Soft Start and Seals
    EX 10.8Disposal Site Characterisation and Impact Assessment
    EX 10.9Environmental Management and Monitoring Plan: 1. Marine Works (Draft)
    EX 11.14Biotopes of the Intertidal and Subtidal Sediments around the AMEP site, in the Humber Estuary
    EX 11.16Assessment Update for Breeding Birds
    EX 11.17AMEP Vascular Plant Surveys
    EX 11.18Sensitive Months for Birds Using Intertidal
    EX 11.19AMEP Bat Surveys Supplementary Note
    EX 11.20Draft Great Crested Newts Licence Application – acknowledgement of receipt
    EX 11.22The Impact of SPMTs and Cranes on the Operational Buffer
    EX 11.23Immediate Habitat Losses Within the Designated Site
    EX 11.24Medium and Long Term Losses Within the Designated Site
    EX 11.26Pumping Station
    EX 11.26AWater Vole Mitigation
    EX 11.27Killingholme Phase 2 Survey
    EX 11.27ABreeding Bird Mitigation
    EX 11.28Great Crested Newt Survey (2006)
    EX 11.29Water Vole Survey (2009)
    EX 11.30Location of Replacement Ponds for Great Crested Newts
    EX 11.31M456 Invertebrate Survey
    EX 11.32Draft Environmental Monitoring and Management Plan: 2. Terrestrial Habitat – Killingholme
    EX 11.33In combination Effects on Curlew
    EX 13.2Addendum to Flood Risk Assessment
    EX 14.4Simulation Videos and Stills
    EX 15.3A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit
    EX 15.4A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit Designer’s Response
    EX 15.5Additional Junction RSA
    EX 19.1Lighting Lux Plans
    EX 20.3Additional Landscape Masterplan
    EX 28.1Compensation Site Interim Report on Detailed Design
    EX 28.2Old Little Humber Farm: Wet Grassland Creation, Management and Monitoring Plan
    EX 28.3Final Compensation Proposals, Parts 1–10
    EX 31.5Re-Use of In Situ Material at CCS (Inc. Cherry Cobb Sands Phase 2 Site Investigation)
    EX 31.5AFactual Report on Geo–Environmental Ground Investigation, Cherry Cobb Sands
    EX 34.2An Assessment of Temporal Variation of Benthic Invertebrate Communities in the Humber Estuary
    EX 35.12Farmland Disturbance at Cherry Cobb Sands
    EX 35.13Badger Bait–Marking Survey
    EX 35.14Cherry Cobb Sands Compensation Site: Bird Survey Results August 2010 to April 2011
    EX 36.2North Bank Flood Defence Crest Height
    EX 36.3Residual Flood Risk to Property on North Bank
    EX 36.4Embankment Inspection and Maintenance Report
    EX 44.1Supplementary In-Combination Assessment
    EX 44.2Addendum to EX 44.1
  • ; and

  • “the water framework directive” means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2010 establishing a framework for Community action in the field of water policyf2.

Annotations

Textual amendments

F1

Words in Sch. 11 para. 1 inserted (14.5.2021) by The Able Marine Energy Park Development Consent (Amendment) Order 2021 (S.I. 2021/606), arts. 1, 2(4)

Commencement

I1

Sch. 11 para. 1 in force at 29.10.2014, see Introductory Text

Footnotes

f1

S.I.. 2009/2264.

f2

O.J. No L327, 22.12.2000, p. 1-73.