Part 5 Design drawingsI1F1
England, Wales and Scotland
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Key Plan for Design Drawings | 15/WPD/100 | A |
| 132kV Overhead Line Work No. 1 Profiles | 15/WPD/106 | B |
| 132kV Overhead Line Work No. 2 Profiles | 15/WPD/102 | A |
| 132kV Overhead Line Wood Pole Outlines | 15/WPD/103 | A |
| Design Drawings 132kV Underground Cables | 15/WPD/104 | A |
Annotations
Textual amendments
- F1
Sch. 2 Pt. 5 table substituted (10.3.2017) by The Brechfa Forest Wind Farm Connection (Correction) Order 2017 (S.I. 2017/343), arts. 1, 2(2)
Commencement
- I1
Sch. 2 Pt. 5 in force at 28.10.2016, see art. 1