Paragraph 5 Restrictions on the limits of deviationI1
England, Wales and Scotland
Excluding poles 155 and 203, no pole shall move more than 5m from its location (as shown on the works plans).
The electric line shall not move outside the limits of deviation.
Notwithstanding the approved works plans C/WP/PS/3 and C/WP/PS/5 and subject to Requirement 5 (5) there shall be no deviation of poles 126, 127, 128, 154 and 155 from their positions, or access to those poles, without the prior written consent of the relevant planning authority.
Pole 76 shall not be deviated closer to Bryn Meusydd than shown on works plan F1A/WP/PS/1 Sheet 7 of 7.
Pole 155 may deviate up to 25m from its location (as shown on the works plans) and within the Order limits provided any deviation is agreed in writing with the landowner.
Annotations
Textual amendments
- F1
Words in Sch. 3 requirement 5(4) substituted (10.3.2017) by The Brechfa Forest Wind Farm Connection (Correction) Order 2017 (S.I. 2017/343), arts. 1, 2(7)
Commencement
- I1
Sch. 3 para. 5 in force at 28.10.2016, see art. 1