OpenLegislation

Part 15 GAS HANDLING EQUIPMENT OPTIONS (WORK Nos. 8 and 9)

Original text. Later amendments are not shown.

(1) Item(2) Number(3) Maximum design parameters(4) Maximum height(5) Maximum Capacity
Finished ground level (+ or – 0.5m)––9m AOD–
Gas holder/gas bag (Work No. 8)117m diameter29m AOD (20m above FGL) including lightning protection2,000m3
Flare stack (Work No. 8)124m AOD (15m above FGL)2,000m3/hr
Footprint of biogas storage and operational area (Work No. 8)170m x 50m
Foundation depthPiles to a depth of -16m AOD (25m below FGL)
EITHER        
Biogas upgrading plant (Work No. 9)150m x 50m21m AOD (12m above FGL)1,000m3/hr
OR        
Combined heat and power (CHP) plant (Work No. 9)2 CHP engines50m x 50m33m AOD (24m above FGL) stack combined with boiler flue (see Part 16 below)1.5 MW thermal input per CHP engine (total maximum 3MWth)