Paragraph 17 Foul Water Drainage

Original text. Later amendments are not shown.

(1)

No phase of the onshore works may be commenced until written details of the foul water drainage system, if any, (including means of pollution control) for the construction of that phase of the onshore works have been submitted to and approved by the relevant drainage and sewerage authorities in consultation with the lead local flood authority and the Environment Agency.

(2)

No phase of the onshore works may be commenced until written details of the foul water drainage system, if any, (including means of pollution control) for the operation of that phase of the onshore works have been submitted to and approved by the relevant drainage and sewerage authorities in consultation with the lead local flood authority and the Environment Agency.

(3)

The foul water drainage system must be constructed, operated and maintained in accordance with the approved written details.

(4)

Written details submitted under sub-paragraphs (1) and (2) may cover one or more phase of the onshore works.