Part 1 Requirements
Wind turbine generator dimensions
Subject to sub-paragraph (2), wind turbine generators forming part of the authorised project must not—
exceed a height of 376.8 metres when measured from MHWS to the tip of the vertical blade;
exceed a rotor diameter of 344.08 metres;
be less than 830 metres from the nearest wind turbine generator in any direction;
have a distance of less than 34 metres between the lowest point of the rotating blade of the wind turbine generator and mean sea level;
exceed 100 wind turbine generators in respect of the DBS East Project offshore works; or
exceed 100 wind turbine generators in respect of the DBS West Project offshore works.
References to the location of a wind turbine generator are references to the centre point at the base of the wind turbine generator.
Wind turbine generator foundations
Wind turbine generator foundations must be one or more of the following options: piled monopile foundation or piled jacket foundation.
Any wind turbine generator piled monopile foundations must not have a pile diameter exceeding 15 metres.
Any wind turbine generator piled jacket foundation must not have—
more than four legs;
more than four piles; or
a pile diameter exceeding four metres.
Within Work No. 1A, the wind turbine generator foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 311,725 square metres; or
a total combined amount of scour protection exceeding 302,221.21 square metres.
Within Work No. 1B, the wind turbine generator foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 311,725 square metres; or
a total combined amount of scour protection exceeding 302,221.21 square metres.
Offshore converter platform dimensions
The total number of offshore converter platforms and offshore accommodation platforms in respect of the authorised project must not exceed two, consisting of one offshore converter platform and one offshore accommodation platform.
The dimensions of any offshore converter platform and offshore accommodation platform (excluding helidecks, lightning protection, towers, masts and cranes) must not exceed—
125 metres in length;
100 metres in width; or
105 metres in height above LAT.
Offshore converter platform foundations
Offshore converter platforms and offshore accommodation platform foundations must be of one or more of the following foundation options: piled monopile, or piled jacket.
Any offshore converter platform or offshore accommodation platform piled monopile foundation must not have a pile diameter exceeding 15 metres.
Any offshore converter platform or offshore accommodation platform piled jacket foundation must not have—
more than eight legs;
more than eight piles; or
a pile diameter exceeding 3.8 metres.
Any offshore converter platform or offshore accommodation platform foundation must not have—
a seabed footprint (including scour protection) exceeding 5,411 square metres for piled monopile or piled jacket foundations; or
a seabed footprint (excluding scour protection) exceeding 177 square metres for piled monopile or piled jacket foundations.
Within Work Nos. 4A and 4B, the offshore accommodation platform foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 5,411 square metres; or
a total combined amount of scour protection exceeding 5,234 square metres.
Within Work Nos. 2A and 2B, the offshore converter platform foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 10,822 square metres; or
a total combined amount of scour protection exceeding 10,468 square metres.
The total volume of scour protection for wind turbine generators, offshore converter platforms and offshore accommodation platforms must not exceed 1,067,840 cubic metres.
Cables and cable protection
Within Work No. 1A the array cables must not, in total—
exceed 350 kilometres in length;
exceed 20 cable crossings;
have cable protection (including cable crossings) exceeding 375,780 square metres in area; or
have cable protection (including cable crossings) exceeding 219,115 cubic metres in volume.
Within Work No. 1B the array cables must not, in total—
exceed 350 kilometres in length;
exceed 20 cable crossings;
have cable protection (including cable crossings) exceeding 375,780 square metres in area; or
have cable protection (including cable crossings) exceeding 219,115 cubic metres in volume.
Within Work No. 2A the inter-platform cables must not, in total—
exceed 1 in number;
exceed 23 kilometres in length;
exceed 1 cable crossing;
have cable protection (including cable crossings) exceeding 43,203 square metres in area; or
have cable protection (including cable crossings) exceeding 39,207 cubic metres in volume.
Within Work No. 2B the inter-platform cables must not, in total—
exceed 1 in number;
exceed 23 kilometres in length;
exceed 1 cable crossing;
have cable protection (including cable crossings) exceeding 43,203 square metres in area; or
have cable protection (including cable crossings) exceeding 39,207 cubic metres in volume.
Within Work No. 3A, the offshore export cables must not, in total—
exceed 2 in number;
exceed 376 kilometres in length;
exceed 12 cable crossings;
have cable protection (including cable crossings) exceeding 576,021 square metres in area; or
have cable protection (including cable crossings) exceeding 522,615 cubic metres in volume.
Within Work No. 3B the offshore export cables must not, in total—
exceed 2 in number;
exceed 306 kilometres in length;
exceed 12 cable crossings;
have cable protection (including cable crossings) exceeding 470,350 square metres in area; or
have cable protection (including cable crossings) exceeding 426,747 cubic metres in volume.
Within Work Nos. 5A and 5B the inter-platform cables must not, in total—
exceed 3 in number;
exceed 138 kilometres in length;
exceed 9 cable crossings;
have cable protection (including cable crossings) exceeding 286,808 square metres in area; or
have cable protection (including cable crossings) exceeding 260,234 cubic metres in volume.
Within Work Nos. 8A and 8B the offshore export cables must not, in total—
exceed 4 in number;
involve cable crossings; or
have any cable protection.
- 1Time limits
- 7Offshore decommissioning
- 8Phases of authorised development
- 9Detailed design parameters onshore
- 10Provision of landscaping
- 11Implementation and maintenance of landscaping
- 12Ecological management plan
- 13Permanent fencing and other means of enclosure
- 14Traffic and Transport
- 15Highway accesses
- 16Pre-commencement, Construction and Operational Drainage Strategy
- 17Foul Water Drainage
- 18Onshore Archaeology
- 19Code of construction practice
- 20Construction hours for the onshore works
- 21Control of noise during operational phase
- 22Control of artificial light emissions
- 23European protected species: onshore
- 24Public Rights of Way Management Plan
- 25Restoration of land used temporarily for construction
- 26Skills and employment
- 27Onshore decommissioning
- 28Notification of generation of power
- 29Contaminated land and groundwater scheme
- 30Port traffic
- 31Ministry of Defence Radar Mitigation
- 32Biodiversity net gain
- 33Onshore monitoring plan
- 34Amendments to approved details
- 35Onshore collaboration
- 36Permanent access road to onshore converter stations
- 37Wake effects plan