Paragraph I1
England and Wales
Work No. 1 – an electricity generating station (Unit X) fuelled by natural gas and with a gross electrical output capacity of up to 1,800 megawatts including—
Work No. 1A – a gas generating unit comprising—
up to two gas turbines able to operate in both combined cycle and open cycle modes;
one turbine hall building for the gas turbines within this Work;
up to two heat recovery steam generators;
up to two heat recovery steam generator buildings and up to two exhaust gas emission flue stacks for the heat recovery steam generators within this Work;
up to two bypass stacks;
transformers;
gas turbine air inlet filter house;
power control centre;
feed water pump house building;
water supply and pipelines;
water storage tanks and pipelines;
emergency diesel generator and diesel fuel tank for safe shut-down of the plant;
switch gear and ancillary equipment;
up to two turbine outage store buildings;
400 kilovolt electrical underground cables and telemetry and electrical protection auxiliary cabling connecting to Work No. 4A; and
a new main fuel gas station comprising up to two individual fuel gas stations comprising for each—
a gas receiving area;
gas treatment and control facilities including filters, preheating and liquid collection tanks; and
other auxiliary control cabinets.
Work No. 1B
a new main pipe rack carrying main steam and condensate, and auxiliary cabling and pipework between the heat recovery steam generators and the existing steam turbine;
piling for foundations to accommodate the pipe rack including in connection with the pipe rack comprising part of Work No. 2B; and
modifications to the existing steam turbine, generating plant and turbine hall building.
Work No. 1C – a new underground gas pipeline across New Road connecting Work No. 1A to Work No. 5.
Work No. 1D – in connection with and in addition to Work Nos. 1A, 1B and 1C—
works connecting Work Nos. 1A, 1B and 1C to existing equipment and utilities;
ground raising and ground preparation works;
site lighting infrastructure, including perimeter lighting columns;
internal roadways, car parking, pedestrian network, cycle parking and hardstanding;
site drainage and waste management infrastructure, including relocation of existing infrastructure as required;
electricity (including a 132 kilovolt electricity cable across New Road connecting Work No. 1A to Work No.5), water, wastewater and telecommunications and other services; and
hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.
Annotations
Commencement
- I1
Sch. 1 in force at 25.10.2019, see art. 1