Work No. 1 – an electricity generating station (Unit X) fuelled by natural gas and with a gross electrical output capacity of up to 1,800 megawatts including—

(a)

Work No. 1A – a gas generating unit comprising—

(i)

up to two gas turbines able to operate in both combined cycle and open cycle modes;

(ii)

one turbine hall building for the gas turbines within this Work;

(iii)

up to two heat recovery steam generators;

(iv)

up to two heat recovery steam generator buildings and up to two exhaust gas emission flue stacks for the heat recovery steam generators within this Work;

(v)

up to two bypass stacks;

(vi)

transformers;

(vii)

gas turbine air inlet filter house;

(viii)

power control centre;

(ix)

feed water pump house building;

(x)

water supply and pipelines;

(xi)

water storage tanks and pipelines;

(xii)

emergency diesel generator and diesel fuel tank for safe shut-down of the plant;

(xiii)

switch gear and ancillary equipment;

(xiv)

up to two turbine outage store buildings;

(xv)

400 kilovolt electrical underground cables and telemetry and electrical protection auxiliary cabling connecting to Work No. 4A; and

(xvi)

a new main fuel gas station comprising up to two individual fuel gas stations comprising for each—

(aa)

a gas receiving area;

(bb)

gas treatment and control facilities including filters, preheating and liquid collection tanks; and

(cc)

other auxiliary control cabinets.

(b)

Work No. 1B

(i)

a new main pipe rack carrying main steam and condensate, and auxiliary cabling and pipework between the heat recovery steam generators and the existing steam turbine;

(ii)

piling for foundations to accommodate the pipe rack including in connection with the pipe rack comprising part of Work No. 2B; and

(iii)

modifications to the existing steam turbine, generating plant and turbine hall building.

(c)

Work No. 1C – a new underground gas pipeline across New Road connecting Work No. 1A to Work No. 5.

(d)

Work No. 1D – in connection with and in addition to Work Nos. 1A, 1B and 1C—

(i)

works connecting Work Nos. 1A, 1B and 1C to existing equipment and utilities;

(ii)

ground raising and ground preparation works;

(iii)

site lighting infrastructure, including perimeter lighting columns;

(iv)

internal roadways, car parking, pedestrian network, cycle parking and hardstanding;

(v)

site drainage and waste management infrastructure, including relocation of existing infrastructure as required;

(vi)

electricity (including a 132 kilovolt electricity cable across New Road connecting Work No. 1A to Work No.5), water, wastewater and telecommunications and other services; and

(vii)

hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.

Annotations

Commencement

I1

Sch. 1 in force at 25.10.2019, see art. 1