Paragraph I1

England and Wales

Work No. 4 – new gas insulated switchgear banking buildings including—

(a)

Work No. 4A (in connection with Unit X)—

(i)

a building containing gas insulated switchgear and other associated switch gear and ancillary equipment;

(ii)

a building containing control equipment;

(iii)

up to three sets of cable sealing ends; and

(iv)

ground raising and ground preparation works.

(b)

Work No. 4B (in connection with Unit Y)—

(i)

a building or an extension to the building in Work No. 4A containing gas insulated switchgear and other switch gear and ancillary equipment;

(ii)

up to three sets of cable sealing ends; and

(iii)

ground raising and ground preparation works.

Annotations

Commencement

I1

Sch. 1 in force at 25.10.2019, see art. 1