Paragraph I1

England and Wales

Work No. 5 – a natural gas receiving facility compound including—

(a)

pipeline inspection gauge (PIG) trap receiving equipment;

(b)

isolation valves, inline valves, metering, heat exchangers, filtering, pressure regulation equipment, pipework;

(c)

electricity supply kiosks and associated cabling;

(d)

emergency generator;

(e)

electrical pre-heaters and electrical compressors housed in a building;

(f)

up to two boiler houses with a total installed thermal input capacity F1to the heat exchangers of 7.2 megawatts and each boiler house with up to two stacks;

(g)

control and instrumentation kiosks and associated wiring;

(h)

creation of a permanent access from New Road including permanent road surface and kerb stones, signing and road markings works, drainage, car parking, fencing and other incidental works;

(i)

security infrastructure, including cameras, lighting (including perimeter lighting columns), stock proof fencing and perimeter fencing;

(j)

a new underground gas pipeline;

(k)

external cooling system;

(l)

ground raising and ground preparation works; and

(m)

hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.

Annotations

Textual amendments

F1

Words in Sch. 1 inserted (19.8.2020) by The Drax Power (Generating Stations) (Correction) Order 2020 (S.I. 2020/879), art. 1(2), Sch.

Commencement

I1

Sch. 1 in force at 25.10.2019, see art. 1