Paragraph I1
England and Wales
Work No. 5 – a natural gas receiving facility compound including—
pipeline inspection gauge (PIG) trap receiving equipment;
isolation valves, inline valves, metering, heat exchangers, filtering, pressure regulation equipment, pipework;
electricity supply kiosks and associated cabling;
emergency generator;
electrical pre-heaters and electrical compressors housed in a building;
up to two boiler houses with a total installed thermal input capacity F1to the heat exchangers of 7.2 megawatts and each boiler house with up to two stacks;
control and instrumentation kiosks and associated wiring;
creation of a permanent access from New Road including permanent road surface and kerb stones, signing and road markings works, drainage, car parking, fencing and other incidental works;
security infrastructure, including cameras, lighting (including perimeter lighting columns), stock proof fencing and perimeter fencing;
a new underground gas pipeline;
external cooling system;
ground raising and ground preparation works; and
hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.
Annotations
Textual amendments
- F1
Words in Sch. 1 inserted (19.8.2020) by The Drax Power (Generating Stations) (Correction) Order 2020 (S.I. 2020/879), art. 1(2), Sch.
Commencement
- I1
Sch. 1 in force at 25.10.2019, see art. 1