Paragraph I1
England and Wales
Work No. 7 – a gas pipeline including—
(a)
Work No. 7A—
(i)
an underground gas pipeline connection and telemetry cabling, 3km in length and up to 600 millimetres nominal diameter, connecting Work No. 5 to Work No. 6B;
(ii)
pipeline field marker posts and cathodic protection test/transformer rectifier units;
(iii)
below ground drainage works;
(iv)
works required in order to protect existing utilities infrastructure;
(v)
tree and hedge removal; and
(vi)
hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.
(b)
Work No. 7B – temporary construction laydown area for gas pipeline.
Annotations
Commencement
- I1
Sch. 1 in force at 25.10.2019, see art. 1