Work No. 8 – electrical connections including—
Work No. 8A (in connection with Unit X) – up to 400 kilovolt underground electrical connection between Work No. 4A and the existing 400 kilovolt National Grid substation busbars—
electrical underground cables and telemetry and electrical protection auxiliary cabling;
one set of cable sealing ends;
insulated switchgear and overhead busbars;
trenching works;
site drainage;
security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and
hard and soft landscaping including ecological mitigation.
Work No. 8B (in connection with Unit Y) – up to 400 kilovolt underground electrical connection between Work No. 4B and the existing 400 kilovolt National Grid substation busbars of either—
electrical underground cables and telemetry and electrical protection auxiliary cabling;
one set of cable sealing ends;
insulated switchgear and overhead busbars;
trenching works;
site drainage;
security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and
hard and soft landscaping including ecological mitigation;
Or—
electrical underground cables and telemetry and electrical protection auxiliary cabling;
a 400 kilovolt cable sealing end compound—
one set of cable sealing ends;
air insulated switchgear and overhead busbars; and
overhead conductor gantry, overhead conductors and other plant and structures required to manage the transmission of electricity;
trenching works;
site drainage;
security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and
hard and soft landscaping including ecological mitigation.