Paragraph I1

England and Wales

Work No. 8 – electrical connections including—

(a)

Work No. 8A (in connection with Unit X) – up to 400 kilovolt underground electrical connection between Work No. 4A and the existing 400 kilovolt National Grid substation busbars—

(i)

electrical underground cables and telemetry and electrical protection auxiliary cabling;

(ii)

one set of cable sealing ends;

(iii)

insulated switchgear and overhead busbars;

(iv)

trenching works;

(v)

site drainage;

(vi)

security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and

(vii)

hard and soft landscaping including ecological mitigation.

(b)

Work No. 8B (in connection with Unit Y) – up to 400 kilovolt underground electrical connection between Work No. 4B and the existing 400 kilovolt National Grid substation busbars of either—

(i)

electrical underground cables and telemetry and electrical protection auxiliary cabling;

(ii)

one set of cable sealing ends;

(iii)

insulated switchgear and overhead busbars;

(iv)

trenching works;

(v)

site drainage;

(vi)

security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and

(vii)

hard and soft landscaping including ecological mitigation;

Or—

(viii)

electrical underground cables and telemetry and electrical protection auxiliary cabling;

(ix)

a 400 kilovolt cable sealing end compound—

(aa)

one set of cable sealing ends;

(bb)

air insulated switchgear and overhead busbars; and

(cc)

overhead conductor gantry, overhead conductors and other plant and structures required to manage the transmission of electricity;

(x)

trenching works;

(xi)

site drainage;

(xii)

security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and

(xiii)

hard and soft landscaping including ecological mitigation.