Paragraph 1 InterpretationI1
England, Wales and Scotland
In this Part of this Schedule—
“AOD” means above ordnance datum;
“highway authority” means the local highway authority for the relevant area;
“onshore cable corridor” means the onshore area in which the cables will be located within the Order limits;
“stage” means one of the nine stages of the connection works comprised in—
- (i)
F1Works No. 3B and 3C (using the construction consolidation site at Work No. 4);
- (ii)
Works No. 5 to 7A (using the construction consolidation site at Work No. 7B);
- (iii)
Works No. 8 to 10A (using the construction consolidation site at Work No. 10B);
- (iv)
Works No. 11 to 15(using the construction consolidation site at Work No. 16);
- (v)
Works No. 17 to 23A (using the construction consolidation site at Work No. 23B);
- (vi)
Works No. 23C to 28A (using the construction consolidation site at Work No. 28B);
- (vii)
Works No. 29 to 30A (using the construction consolidation site at Work No. 30B);
- (viii)
Works No. 31 to 34A (using the construction consolidation site at Work No. 34B);
- (ix)
Works No. 35A to 37D (using the construction consolidation site at Work No. 37E);
- (x)
Works No. 38 to 41;
or such other stage of the connection works agreed in writing with the relevant local planning authority;
- (i)
“working width” means the construction width of the onshore cable corridor including haul route, spoil storage and temporary drainage during installation of cables and/or cable ducts.
Annotations
Textual amendments
- F1
Sch. 1 Pt. 3 Requirement 1: paragraphs renumbered (25.3.2016) by The East Anglia ONE Offshore Wind Farm (Corrections and Amendments) Order 2016 (S.I. 2016/447), art. 1, Sch. 1
Commencement
- I1
Sch. 1 Pt. 3 para. 1 in force at 7.7.2014, see art. 1