The East Anglia ONE Offshore Wind Farm Order 2014
S.I. 2014/1599 · Made 16 June 2014 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 16th June 2014
Coming into force 7th July 2014
And whereas the application was examined by a Panel appointed as an examining authority by the Secretary of State pursuant to Chapter 4 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3;
The examining authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74 of the 2008 Act made a report and recommendation to the Secretary of State;
The Secretary of State, having considered the report and recommendation of the Panel, and decided the application, has determined to make an Order giving effect to the proposals comprised in the application with modifications which in its opinion do not make any substantial change to the proposals;
The Secretary of State in exercise of the powers conferred by sections 114, 115, 120, and 149A of the 2008 Act the Secretary of State makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
S.I. 2009/2264 as amended by the Localism Act (Infrastructure Planning) (Consequential Amendments) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Prescribed Consultees and Interested Parties etc) (Amendment) Regulations 2013 (S.I. 2013/522).
- f2
-
2008 c.29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c.20).
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal powers
- 3Development consent etc. granted by the Order
- 4Power to construct and maintain authorised project
- 5Benefit of the Order
- 6Application and modification of legislative provisions
- 7Defence to proceedings in respect of statutory nuisance
- Part 3: Streets
- 8Street works
- 9Temporary stopping up of public rights of way
- 10Temporary stopping up of streets
- 11Access to works
- 12Agreements with street authorities
- Part 4: Supplemental powers
- 13Discharge of water
- 14Authority to survey and investigate the land
- Part 5: Powers of acquisition
- 15Compulsory acquisition of land
- 16Time limit for exercise of authority to acquire land compulsorily
- 17Compulsory acquisition of rights
- 18Private rights
- 19Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 20Acquisition of subsoil only
- 21Acquisition of part of certain properties
- 22Rights under or over streets
- 23Temporary use of land for carrying out the authorised project
- 24Temporary use of land for maintaining authorised project
- 25Protective provisions for specified undertakers
- 26Statutory undertakers
- 27Recovery of costs of new connections
- Part 6: Operations
- 28Operation of generating station
- 29Deemed marine licences under the Marine and Coastal Access Act 2009
- Part 7: Miscellaneous and general
- 30Application of landlord and tenant law
- 31Operational land for purposes of the 1990 Act
- 32Felling or lopping of trees and removal of hedgerows
- 33Certification of plans etc.
- 34Arbitration
- 35Requirements, appeals, etc.
- 36Abatement of works abandoned or decayed
- 37Saving provisions for Trinity House
- 38Crown rights
- 39... Repealed
- Signature
- Schedule 1: Authorised project
- Part 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Part 2: Ancillary works
- 1Paragraph 1
- Part 3: Requirements
- 1Interpretation
- 2Time limits
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 7AAs built offshore parameters
- 8Aviation safety
- 9Offshore decommissioning
- 10Detailed design approval onshore
- 11Landfall method statement
- 12Provision of landscaping
- 13Implementation and maintenance of landscaping
- 14Highway accesses and improvements
- 15Fencing and other means of enclosure
- 16Surface and foul water drainage
- 17Contaminated land and ground water
- 18Archaeology
- 19Ecological management plan
- 20Code of construction practice
- 21External lighting and control of artificial light emissions
- 22Control of noise during construction
- 23Construction hours
- 24Control of noise during operational phase
- 25Traffic
- 26Port travel plan
- 27European protected species
- 28Restoration of land used temporarily for construction
- 29Installation of cable ducts
- 30Skills strategy
- 31Onshore decommissioning
- 32Decommissioning of Work No. 3B and Work No. 4
- 33Requirement for written approval
- 34Amendments to approved details
- 35Transmission system
- 36Marine mammal mitigation protocol
- Schedule 2Streets subject to street works
- Schedule 3: Public rights of way to be temporarily stopped up
- 1Rights of way for which a replacement will be provided during stopping up
- 2Rights of way for which no replacement will be provided during the temporary stopping up
- Schedule 4Streets to be temporarily stopped up
- Schedule 5Access to works
- Schedule 6Land in which only new rights etc. may be acquired
- Schedule 7: Modification of compensation and compulsory purchase enactments for creation of new rights
- 1Compensation enactments
- 2Paragraph 2
- 3Application of the 1965 Act
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Schedule 8Land of which temporary possession may be taken
- Schedule 9: Protective provisions
- Part 1: Protection for electricity, gas, water and sewerage undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Part 2: Protection for operators of electronic communications code networks
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- Part 3: Protection of Network Rail Infrastructure Limited
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- Part 4: For the protection of Anglian Water Services Limited
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 5: For the protection of National Grid Gas plc and National Grid Electricity Transmission plc
- 1Application
- 2Interpretation
- 3Apparatus of undertakers in stopped up streets
- 4Acquisition of land
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Retained apparatus: protection: gas undertakers
- 8Retained apparatus: protection: electricity undertakers
- 9Expenses
- 10Compensation
- 11Ground subsidence monitoring scheme in respect of statutory undertakers’s apparatus
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- Schedule 10: Deemed licence under the Marine and Coastal Access Act 2009 – generation assets
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 2: Conditions
- 1Design parameters for wind turbines
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Notifications and inspections
- 7Offshore safety management
- 8Aids to navigation
- 9Chemicals, drilling and debris
- 10Force majeure
- 11Pre-construction plans and documentation
- 12Paragraph 12
- 13Paragraph 13
- 14Foundation restrictions
- 15Reporting of engaged agents, contractors and vessels
- 16Equipment and operation of vessels engaged in licensed activities
- 17Pre-construction monitoring and surveys
- 18Construction monitoring
- 19Post construction
- Schedule 11: Deemed licence under the Marine and Coastal Access Act 2009 – transmission assets
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 2: Conditions
- 1Design parameters
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Notifications and inspections
- 6Offshore safety management
- 7Aids to navigation
- 8Chemicals, drilling and debris
- 9Force majeure
- 10Pre-construction plans and documentation
- 11Paragraph 11
- 12Paragraph 12
- 13Foundation restrictions
- 14Reporting of engaged agents, contractors and vessels
- 15Equipment and operation of vessels engaged in licensed activities
- 16Pre-construction monitoring and surveys
- 17Construction monitoring
- 18Post construction
- Schedule 12Removal of important hedgerows
- Explanatory note