Part 2 Conditions
England, Wales and Scotland
- 1Design parameters
- 2Design parameters
- 3Design parameters
- 4Design parameters
- 5Design parameters
- 6Notifications and inspections
- 7Aids to navigation
- 8Aids to navigation
- 9Aviation safety
- 10Chemicals, drilling and debris
- 11Force majeure
- 12UXO clearance
- 13Pre-construction plans and documentation
- 14Pre-construction plans and documentation
- 15Reporting of engaged agents, contractors and vessels
- 16Pre-construction monitoring and surveys
- 17Construction monitoring
- 18Post construction
- 19Reporting of impact pile driving/detonation of explosives
- 20Scour protection and cable protection during operation
- 21Co-operation
- 22Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 23Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
- 24Control of piling and UXO detonations
- 25Herring spawning
- 26Sediment sampling
- 27Completion of construction