Part 1 Documents forming the environmental statement to be certifiedI1
England, Wales and Scotland
| (1) | (2) | (3) | (4) | (5) |
|---|---|---|---|---|
Document Reference (and relevant ES Chapters) | Examination Library Reference (and relevant ES Chapter reference) | Document Name | Version | Date |
| 6.1 | APP-049 to APP-079 | Environmental Statement | 1 | 25th October 2019 |
| 6.2 | APP-080 to APP-441 | Figures | 1 | 25th October 2019 |
| 6.3 | APP-442 to APP-571 | Technical Appendices | 1 | 25th October 2019 |
ExA.WQ-1.A10.D1.V1 (Chapter 6) | REP1-099 (APP-054) | Applicants’ Responses to WQ1 Appendix 10 Landfall Indicative HDD Working Area | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A11.D1.V1 (Chapter 6) | REP1-100 (APP-054) | Applicants’ Responses to WQ1 Appendix 11 Landfall HDD Cross Sections | 1 | Deadline 1 2nd November 2020 |
ExA.AS-13.D6.V1 (Chapter 6) | REP6-024 (APP-054) | HDD Verification Clarification Note | 1 | Deadline 6 24th February 2021 |
ExA.WQ-1.A6.D1.V1 (Chapter 6) | REP1-090 (APP-054) | Applicants’ Responses to WQ1 Appendix 6 Illustrative Open Trench and Trenchless Onshore Cable Route | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A7.D1.V1 (Chapter 6) | REP1-091 (APP-054) | Applicants’ Responses to WQ1 Appendix 7 Onshore Crossing Schedule | 1 | Deadline 1 2nd November 2020 |
ExA.AS-10.D3.V1 (Chapter 6) | REP3-056 (APP-054) | Onshore Cable Route Works Programme Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.AS-11.D3.V1 (Chapter 6) (Chapter 29) | REP3-057 (APP-054) (APP-077) | Onshore Substations Update Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.AS-12.D3.V1 (Chapter 6) | REP3-058 (APP-054) | Construction in Proximity to Properties | 1 | Deadline 3 15th December 2020 |
6.3.6.2 (Chapter 6) | REP8-015 (APP-054) | EA2 Environmental Statement Appendix 6.2 Relationship of Onshore Plans Secured by the DCO | 5 | Deadline 8 25th March 2021 |
6.3.6.3 (Chapter 6) | REP8-016 (APP-054) | EA2 Environmental Statement Appendix 6.3 Relationship of Offshore Plans Secured by the DCO | 5 | Deadline 8 25th March 2021 |
6.3.6.4 (Chapter 6) | REP3-020 (APP-054) | EA2 Environmental Statement Appendix 6.4 Cumulative Project Description | 2 | Deadline 3 15th December 2020 |
ExA.RRA6.D0.V1 (Chapters 7 to 17) | AS-043 (APP-055 to APP-065) | F1Applicant’s Comments on Relevant Representations F2... Appendix 6 Disposal Site Locations (Windfarm Site) | 1 | 11th June 2020 |
ExA.RRA2.D0.V1 (Chapter 7) | AS-039 (APP-055) | Applicant’s Comments on Relevant Representations ... Appendix 2 Wave Climatology Clarification Note | 1 | 11th June 2020 |
ExA.AS-13.D3.V1 (Chapter 7) (Chapter 9) (Chapter 10) (Chapter 12) | REP3-059 (APP-055) (APP-057) (APP-058) (APP-060) | Effects on Supporting Habitats of Outer Thames Estuary SPA Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.RRA3.D0.V1 (Chapter 10) | AS-040 (APP-058) | Applicant’s Comments on Relevant Representations ... Appendix 3 Fish and Shellfish Ecology Clarification Note | 1 | 11th June 2020 |
ExA.AS-5.D11.V2 (Chapter 11) | REP11-045 (APP-059) | Underwater Noise Modelling F3Report Update | 2 | Deadline 11 7th June 2021 |
ExA.AS-3.D2.V1 (Chapter 12) | REP2-006 (APP-060) | Cumulative Auk Displacement and Seabird Assemblage Assessment of FFC SPA and Gannet PVA | 1 | Deadline 2 17th November 2020 |
| ExA.AS-2.D11.V5 (Chapter 12) | REP11-026 (APP-060) | Displacement of red-throated divers in the Outer Thames Estuary SPA | 5 | Deadline 11 7th June 2021 |
ExA.AS-20.D1.V1 (Chapter 19) (Chapter 26) | REP1-040 (APP-067) (APP-074) | Deadline 1 Air Quality Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.AS-16.D3.V1 (Chapter 19) | REP3-061 (APP-067) | Deadline 3 Air Quality Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.WQ-1.A8.D1.V1 (Chapter 20) | REP1-092 (APP-068) | Applicants’ Responses to WQ1 Appendix 8 Environment Agency Flood Zones | 1 | Deadline 1 2nd November 2020 |
ExA.AS-9.D4.V2 (Chapter 20) | REP4-044 (APP-068) | F4Clarification Note SuDS Infiltration Note | 2 | Deadline 4 13th January 2021 |
ExA.AS-12.D6.V1 (Chapter 18) (Chapter 20) | REP6-021 (APP-066) (APP-068) | Landfall Hydrogeological Risk Assessment | 1 | Deadline 6 24th February 2021 |
ExA.AS-13.D8.V1 (Chapter 20) | REP8-038 (APP-068) | Flood Risk and Drainage Clarification Note | 1 | Deadline 8 25th March 2021 |
ExA.AS-11.D1.V1 (Chapter 21) | REP1-022 (APP-069) | Land Use Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A4.D1.V1 (Chapter 22) | REP1-088 (APP-070) | Applicants’ Responses to WQ1 Appendix 4 Ecological Mitigation Works | 1 | Deadline 1 2nd November 2020 |
ExA.AS-12.D1.V1 (Chapter 22) | REP1-023 (APP-070) | Onshore Ecology Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.AS-16.D1.V1 (Chapter 22) | REP1-035 (APP-070) | Ecological Enhancement Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.AS-14.D3.V1 (Chapter 22) | REP3-060 (APP-070) | Deadline 3 Onshore Ecology Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.AS-10.D4.V1 (Chapter 22) | REP4-005 (APP-070) | Deadline 4 Onshore Ecology Clarification Note | 1 | Deadline 4 13th January 2021 |
ExA.AS-14.D6.V1 (Chapter 22) | REP6-025 (APP-070) | Deadline 6 Onshore Ecology Clarification Note | 1 | Deadline 6 24th February 2021 |
ExA.AS-28.D6.V1 (Chapter 22) | REP6-035 (APP-070) | Ecology Survey Results: February 2021 | 1 | Deadline 6 24th February 2021 |
ExA.AS-16.D8.V1 (Chapter 22) | REP8-041 (APP-070) | Ecological Enhancement Clarification Note Addendum | 1 | Deadline 8 25th March 2021 |
ExA.AS-10.D1.V1 (Chapter 24) (Chapter 29) | REP1-021 (APP-072) (APP-077) | Archaeology and Cultural Heritage Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.AS-13.D1.V1 (Chapter 24) | REP1-024 (APP-072) | Pre-Construction Trial Trenching Report | 1 | Deadline 1 2nd November 2020 |
ExA.AS-14.D1.V1 (Chapter 24) | REP1-025 to REP1-033 (APP-072) | Onshore Archaeology Geophysical Survey Report (Parts 1 to 9) | 1 | Deadline 1 2nd November 2020 |
ExA.AS-15.D1.V1 (Chapter 24) | REP1-034 (APP-072) | Onshore Archaeology Earthworks Report | 1 | Deadline 1 2nd November 2020 |
ExA.AS-29.D8.V1 (Chapter 24) | REP8-063 (APP-072) | Cultural heritage Viewpoint 5 Additional Visualisation | 1 | Deadline 8 25th March 2021 |
ExA.AS-16.D3.V1 (Chapter 24) (Chapter 29) | REP3-062 to REP3-068 (APP-072) (APP-077) | Updated Photomontages Clarification Note | 1 | Deadline 3 15th December 2020 |
ExA.AS-11.D4.V1 (Chapter 24) | REP4-006 (APP-072) | Heritage Assessment Addendum | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_001 (Chapter 24) | REP4-007 (APP-072) | Heritage Assessment Addendum Appendix 1 CHVP2 –PRoW between Friston Hall and Friston (Appendix 24.7, Figure 7 Update) | F51 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_002 (Chapter 24) | REP4-008 (APP-072) | Heritage Assessment Addendum Appendix 2 CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_003 (Chapter 24) | REP4-009 (APP-072) | Heritage Assessment Addendum Appendix 3 CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_004 (Chapter 24) | REP4-010 (APP-072) | Heritage Assessment Addendum Appendix 4 CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_005 (Chapter 24) | REP4-011 (APP-072) | Heritage Assessment Addendum Appendix 5 CHVP7 – Friston House (b) (Appendix 24.7, Figure 12 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D4.V1_006 (Chapter 24) | REP4-012 (APP-072) | Heritage Assessment Addendum Appendix 6 CHVP8 – Friston War Memorial (Appendix 24.7, Figure 13 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-30.D11.V1 (Chapter 24) | REP11-075 | Heritage Assessment GIS Addendum | 1 | Deadline 11 7th June 2021 |
ExA.AS-30.D11.V1_01 (Chapter 24) | REP11-076 | Heritage Assessment GIS Addendum App 1 CHVP2 App 24.7 Fig 7 Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-30.D11.V1_02 (Chapter 24) | REP11-077 | Heritage Assessment GIS Addendum App 2 CHVP3 App 24.7 Fig 8 Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-30.D11.V1_03 (Chapter 24) | REP11-078 | Heritage Assessment GIS Addendum App 3 CHVP4 App 24.7 Fig 9 Update | 1 | Deadline 11 7th June 2021 |
| ExA.AS-30.D11.V1_04 (Chapter 24) | REP11-054 | Heritage Assessment GIS Addendum App 4 CHVP5 App 24.7 Fig 10 Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-30.D11.V1_05 (Chapter 24) | REP11-079 | Heritage Assessment GIS Addendum App 5 CHVP7 App 24.7 Fig 12 Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-30.D11.V1_06 (Chapter 24) | REP11-080 | Heritage Assessment GIS Addendum App 6 CHVP8 App 24.7 Fig 13 | 1 | Deadline 11 7th June 2021 |
ExA.AS-14.D8.V1 (Chapter 25) | REP8-039 (APP-073) | Applicants’ Position Statement on Noise | 1 | Deadline 8 25th March 2021 |
ExA.AS-8.D2.V1 (Chapter 25) | REP2-011 (APP-073) | Noise and Vibration Assessment Clarification Note | 1 | Deadline 2 17th November 2020 |
ExA.AS-8.D4.V1 (Chapter 25) | REP4-043 (APP-073) | Noise Modelling Clarification Note | 1 | Deadline 4 13th January 2021 |
ExA.WQ-1.A14.D1.V1 (Chapter 26) | REP1-103 (APP-074) | Applicants’ Responses to WQ1 Appendix 14 Junction Locations | 1 | Deadline 1 2nd November 2020 |
| ExA.AS-8.D1.V1 (Chapter 26) | REP1-048 (APP-074) | Traffic and Transport Clarification Note for Deadline 1 | 1 | Deadline 1 2nd November 2020 |
ExA.AS-6.D6.V2 (Chapter 26) | REP6-043 (APP-074) | Sizewell C Cumulative Impact Assessment Note (Traffic and Transport) | 2 | Deadline 6 24th February 2021 |
ExA.AS-9.D3.V1 (Chapter 26) | REP3-055 (APP-074) | Traffic and Transport Clarification Note for Deadline 3 | 1 | Deadline 3 15th December 2020 |
ExA.AS-26.D4.V1 (Chapter 26) | REP4-027 (APP-074) | Traffic and Transport Deadline 4 Clarification Note | 1 | Deadline 4 13th January 2021 |
ExA.AS-9.D1.V1 (Chapters 27 to 30) | REP1-049 (APP-075 to APP-078) | Public Rights of Way Clarification Note | 1 | Deadline 1 2nd November 2020 |
ExA.AS-5.D2.V1 (Chapter 28) (Chapter 29) | REP2-008 (APP-076) (APP-077) | Effects with Regard to the Statutory Purposes of the Suffolk Coast and Heaths Area of Outstanding Natural Beauty and Accordance with NPS Policy | 1 | Deadline 2 17th November 2020 |
ExA.AS-33.D8.V1 (Chapter 28) | REP8-075 (APP-076) | Landscape and Visual: Sizewell C Cumulative Impact Assessment | 1 | Deadline 8 25th March 2021 |
ExA.WQ-1.A9.7.D1.V1 (Chapter 29) | REP1-093 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.7 EA2 Annotated Viewpoint 1 | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A9.8.D1.V1 (Chapter 29) | REP1-094 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.8 EA2 Annotated Viewpoint 2 | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A9.9.D1.V1 (Chapter 29) | REP1-095 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.9 EA2 Annotated Viewpoint 3 | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A9.10.D1.V1 (Chapter 29) | REP1-096 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.10 EA2 Annotated Viewpoint 4 | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A9.11.D1.V1 (Chapter 29) | REP1-097 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.11 EA2 Annotated Viewpoint 5 | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A9.12.D1.V1 (Chapter 29) | REP1-098 (APP-077) | Applicants’ Responses to WQ1 Appendix 9.12 EA2 Annotated Viewpoint 8 | 1 | Deadline 1 2nd November 2020 |
ExA.AS-7.D2.V1 (Chapter 29) | REP2-010 (APP-077) | Sizewell C Cumulative Impact Assessment Note (Landscape and Visual) | 1 | Deadline 2 17th November 2020 |
ExA.AS-3.D4.V1 (Chapter 29) | REP4-031 (APP-077) | Landscape and Visual Impact Assessment Addendum | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_001 (Chapter 29) | REP4-032 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 1 Viewpoint 1 – Public Right of Way (PRoW) near Friston House (Figure 29.13 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_002 (Chapter 29) | REP4-033 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 2 Viewpoint 2 – Friston, Church Road (Figure 29.14 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_003 (Chapter 29) | REP4-034 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 3 Viewpoint 3 – Grove Road, near Pear Tree Farm (Figure 29.15 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_004 (Chapter 29) | REP4-035 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 4 Viewpoint 4 – Grove Road, near Church Road (Friston) (Figure 29.16 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_005 (Chapter 29) | REP4-036 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 5 Viewpoint 5 – PRoW near Moor Farm (Figure 29.17 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_006 (Chapter 29) | REP4-037 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 6 Viewpoint 6 – Friston, Village Green (Figure 29.18 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_007 (Chapter 29) | REP4-038 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 7 Viewpoint 8 – Saxmundham Road (North of Friston) (Figure 29.20 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-3.D4.V1_008 (Chapter 29) | REP4-039 (APP-077) | Landscape and Visual Impact Assessment Addendum Appendix 8 Viewpoint 9 – B1121 Aldeburgh Road, south of Friston (Figure 29.21 Update) | 1 | Deadline 4 13th January 2021 |
ExA.AS-6.D7.V1 (Chapter 29) | REP7-062 (APP-077) | Updated Figure 29.37- Viewpoint 5 Public Rights of Way, near Moor Farm (with National Grid GIS Substation) | 1 | Deadline 7 4th March 2021 |
ExA.AS-28.D8.V1_01 (Chapter 29) | REP8-055 (APP-077) | National Grid GIS Substation Photomontages: Figure 29.13 Update Viewpoint 1 Public Rights of Way near Friston House | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_02 (Chapter 29) | REP8-056 (APP-077) | National Grid GIS Substation Photomontages: Figure 29.14 Update Viewpoint 2 Friston, Church Road | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_03 (Chapter 29) | REP8-057 (APP-077) | National Grid GIS Substation Photomontages: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_04 (Chapter 29) | REP8-058 (APP-077) | National Grid GIS Substation Photomontages: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston) | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_05 (Chapter 29) | REP8-059 (APP-077) | National Grid GIS Substation Photomontages: Figure 29.21 Update Viewpoint 9: B1121 Aldeburgh Road (south of Friston) | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_06 (Chapter 29) | REP8-060 (APP-077) | National Grid GIS Substation Photomontages: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update) | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_07 (Chapter 29) | REP8-061 (APP-077) | National Grid GIS Substation Photomontages: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update) | 1 | Deadline 8 25th March 2021 |
ExA.AS-28.D8.V1_08 (Chapter 29) | REP8-062 (APP-077) | National Grid GIS Substation Photomontages: CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10-Update) | 1 | Deadline 8 25th March 2021 |
ExA.AS-30.D8.V1_01 (Chapter 29) | REP8-066 (APP-077) | Different colour schemes for Substations Design Principles Statement : Viewpoint 1 Public Rights of Way near Friston House | 1 | Deadline 8 25th March 2021 |
ExA.AS-30.D8.V1_02 (Chapter 29) | REP8-067 (APP-077) | Different colour schemes for Substations Design Principles Statement: Viewpoint 2 Friston, Church Road | 1 | Deadline 8 25th March 2021 |
ExA.AS-30.D8.V1_03 (Chapter 29) | REP8-068 (APP-077) | Different colour schemes for Substations Design Principles Statement: Viewpoint 9 – B1121 Aldeburgh Road, south of Friston | 1 | Deadline 8 25th March 2021 |
ExA.AS-31.D8.V1_01 (Chapter 29) | REP8-071 (APP-077) | Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.14 Update Viewpoint 2 Friston, Church Road | 1 | Deadline 8 25th March 2021 |
ExA.AS-31.D8.V1_02 (Chapter 29) | REP8-072 (APP-077) | Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm | 1 | Deadline 8 25th March 2021 |
ExA.AS-31.D8.V1_03 (Chapter 29) | REP8-073 (APP-077) | Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston) | 1 | Deadline 8 25th March 2021 |
ExA.AS-31.D8.V1_04 (Chapter 29) | REP8-069 (APP-077) | Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update) | 1 | Deadline 8 25th March 2021 |
ExA.AS-31.D8.V1_05 (Chapter 29) | REP8-070 (APP-077) | Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update) | 1 | Deadline 8 25th March 2021 |
ExA.AS-32.D8.V1 (Chapter 29) | REP8-074 (APP-077) | Extension of National Grid Substation Appraisal | 1 | Deadline 8 25th March 2021 |
ExA.AS-4.D11.V1 (Chapter 29) | REP11-028 | Landscape and Visual Impact Assessment GIS Addendum | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_01 (Chapter 29) | REP11-029 | LVIA GIS Addendum Appendix 1 Viewpoint 1 Figure 29.13 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_02 (Chapter 29) | REP11-030 | LVIA GIS Addendum Appendix 2 Viewpoint 2 Figure 29.14 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_03 (Chapter 29) | REP11-031 | LVIA GIS Addendum Appendix 3 Viewpoint 3 Figure 29.15 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_04 (Chapter 29) | REP11-032 | LVIA GIS Addendum Appendix 4 Viewpoint 4 Figure 29.16 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_05 (Chapter 29) | REP11-033 | LVIA GIS Addendum Appendix 5 Viewpoint 5 Figure 29.17 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_06 (Chapter 29) | REP11-034 | LVIA GIS Addendum Appendix 6 Viewpoint 6 Figure 29.18 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_07 (Chapter 29) | REP11-035 | LVIA GIS Addendum Appendix 7 Viewpoint 8 Figure 29.20 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_08 (Chapter 29) | REP11-036 | LVIA GIS Addendum Appendix 8 Viewpoint 9 Figure 29.21 GIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_09 (Chapter 29) | REP11-037 | LVIA GIS Addendum Appendix 9 Viewpoint 1 Figure 29.13 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_10 (Chapter 29) | REP11-038 | LVIA GIS Addendum Appendix 10 Viewpoint 2 Figure 29.14 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_11 (Chapter 29) | REP11-039 | LVIA GIS Addendum Appendix 11 Viewpoint 3 Figure 29.15 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_12 (Chapter 29) | REP11-040 | LVIA GIS Addendum Appendix 12 Viewpoint 4 Figure 29.16 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_13 (Chapter 29) | REP11-041 | LVIA GIS Addendum Appendix 13 Viewpoint 5 Figure 29.17 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_14 (Chapter 29) | REP11-042 | LVIA GIS Addendum Appendix 14 Viewpoint 6 Figure 29.18 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_15 (Chapter 29) | REP11-043 | LVIA GIS Addendum Appendix 15 Viewpoint 8 Figure 29.20 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-4.D11.V1_16 (Chapter 29) | REP11-044 | LVIA GIS Addendum Appendix 16 Viewpoint 9 Figure 29.21 AIS Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-17.D1.V1 (Chapter 30) | REP1-036 (APP-078) | Socio-Economics and Tourism Clarification Note (SZC CIA) | 1 | Deadline 1 2nd November 2020 |
ExA.WQ-1.A13.D1.V1 (Chapter 30) | REP1-102 (APP-078) | Applicants’ Responses to WQ1 Appendix 13 Tourism Impact Review | 1 | Deadline 1 2nd November 2020 |
| 5.3 | APP-043 | Habitat Regulations Assessment - Information to Support the Appropriate Assessment Report | 1 | 25th October 2019 |
| 5.3.1 | APP-044 | Habitat Regulations Assessment - Appendix 1 - Information to Support AA Report - HRA Screening Report | 1 | 25th October 2019 |
| 5.3.2 | REP3-016 | Habitat Regulations Assessment Appendix 2 – Information to Support AA Report – Screening Matrices | 3 | Deadline 3 15th December 2020 |
| 5.3.3 | APP-046 | Habitat Regulations Assessment - Appendix 3 - Information to Support AA Report - Integrity Matrices | 1 | 25th October 2019 |
ExA.AS-19.D1.V1 (Chapter 11) | REP1-038 (APP-059) | Information to Support AA – Addendum for Marine Mammals | 1 | Deadline 1 2nd November 2020 |
ExA.AS-7.D1.V1 (Information to Support Appropriate Assessment Report) | REP1-047 (APP-043 to APP-047) | Deadline 1 Offshore Ornithology Cumulative and In Combination Collision Risk Update | 1 | Deadline 1 2 November 2020 |
ExA.AS-7.D4.V1 (Information to Support Appropriate Assessment Report) | REP4-042 (APP-043 to APP-047) | Deadline 4 Offshore Ornithology Cumulative and In Combination Collision Risk Update | 1 | Deadline 4 13th January 2021 |
ExA.AS-11.D8.V1 (Information to Support Appropriate Assessment Report) | REP8-035 (APP-043 to APP-047) | Deadline 8 Offshore Ornithology Cumulative and In Combination Collision Risk Update | 1 | Deadline 8 25th March 2021 |
ExA.AS-3.D11.V1 (Information to Support Appropriate Assessment Report) | REP11-027 (APP-043 to APP-047) | Deadline 11 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update | 1 | Deadline 11 7th June 2021 |
ExA.AS-8.D12.V1 (Information to Support Appropriate Assessment Report) | REP12-066 (APP-043 to APP-047) | Deadline 12 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update | 1 | Deadline 13 15 July 2021 |
ExA.AS-12.D13.V1 (Information to Support Appropriate Assessment Report) | REP13-019 (APP-043 to APP-047) | Deadline 13 Offshore Ornithology Cumulative and In-Combination Collision Risk and Displacement Update | 1 | Deadline 13 5th July 2021 |
ExA.AS-3.SoSQ.V1 (Information to Support Appropriate Assessment Report) | (APP-043 to APP-047) | Updated Offshore Ornithology Cumulative and In-Combination Collision Risk and Displacement Assessment” | 1 | Column (5) “30 November 2021” |
Annotations
Textual amendments
- F1
Words in Sch. 17 Pt. 1 substituted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.
- F2
Word in Sch. 17 Pt. 1 omitted (22.12.2022) by virtue of The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.
- F3
Word in Sch. 17 Pt. 1 inserted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.
- F4
Words in Sch. 17 Pt. 1 inserted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.
- F5
Word in Sch. 17 Pt. 1 substituted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.
Commencement
- I1
Sch. 17 Pt. 1 in force at 22.4.2022, see art. 1(2)