Division 4.2.3.4.2.1 Data required for train position reportingF1

United Kingdom

Original text. Later amendments are not shown.

The infrastructure manager must:

  1. (a)

    provide a means of real time recording of the times at which trains depart from, arrive at or pass appropriate predefined reporting points on their networks and the delta-time value;

  2. (b)

    provide the specific data required in relation to train position reporting. Such information must include:

    • train identification,

    • identity of reporting point,

    • line on which the train is running,

    • scheduled time at reporting point,

    • actual time at reporting point (and whether depart, arrive or pass — separate arrival and departure times must be provided in respect of intermediate reporting points at which the train calls),

    • number of minutes early or late at the reporting point,

    • initial explanation of any single delay exceeding 10 minutes or as otherwise required by the performance monitoring regime,

    • indication that a report for a train is overdue and the number of minutes by which it is overdue,

    • former train identification(s), if any

    • train cancelled for a whole or a part of its journey.