OpenLegislation

Division BAT 4 BAT is to monitor emissions to air with at least the frequency given below and in accordance with EN standards. If EN standards are not available, BAT is to use ISO, national or other international standards that ensure the provision of data of an equivalent scientific quality.

United Kingdom

Original text. Later amendments are not shown.

Generic EN standards for continuous measurements are EN 15267-1, EN 15267-2, EN 15267-3, and EN 14181. EN standards for periodic measurements are given in the table.

The monitoring frequency does not apply where plant operation would be for the sole purpose of performing an emission measurement.

In the case of plants with a rated thermal input of < 100 MW operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every six months. For gas turbines, periodic monitoring is carried out with a combustion plant load of > 70 %. For co-incineration of waste with coal, lignite, solid biomass and/or peat, the monitoring frequency needs to also take into account Part 6 of Annex VI to the IED.

In the case of use of SCR, the minimum monitoring frequency may be at least once every year, if the emission levels are proven to be sufficiently stable.

In the case of natural-gas-fired turbines with a rated thermal input of < 100 MW operated < 1 500 h/yr, or in the case of existing OCGTs, PEMS may be used instead.

PEMS may be used instead.

Two sets of measurements are carried out, one with the plant operated at loads of > 70 % and the other one at loads of < 70 %.

As an alternative to the continuous measurement in the case of plants combusting oil with a known sulphur content and where there is no flue-gas desulphurisation system, periodic measurements at least once every three months and/or other procedures ensuring the provision of data of an equivalent scientific quality may be used to determine the SO2 emissions.

In the case of process fuels from the chemical industry, the monitoring frequency may be adjusted for plants of < 100 MWth after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

If the emission levels are proven to be sufficiently stable, periodic measurements may be carried out each time that a change of the fuel and/or waste characteristics may have an impact on the emissions, but in any case at least once every year. For co-incineration of waste with coal, lignite, solid biomass and/or peat, the monitoring frequency needs to also take into account Part 6 of Annex VI to the IED.

In the case of process fuels from the chemical industry, the monitoring frequency may be adjusted after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

In the case of plants with a rated thermal input of < 100 MW operated < 500 h/yr, the minimum monitoring frequency may be at least once every year. In the case of plants with a rated thermal input of < 100 MW operated between 500 h/yr and 1 500 h/yr, the monitoring frequency may be reduced to at least once every six months.

If the emission levels are proven to be sufficiently stable, periodic measurements may be carried out each time that a change of the fuel and/or waste characteristics may have an impact on the emissions, but in any case at least once every six months.

In the case of plants combusting iron and steel process gases, the minimum monitoring frequency may be at least once every six months if the emission levels are proven to be sufficiently stable.

The list of pollutants monitored and the monitoring frequency may be adjusted after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

In the case of plants operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every six months.

In the case of plants operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every year.

Continuous sampling combined with frequent analysis of time-integrated samples, e.g. by a standardised sorbent trap monitoring method, may be used as an alternative to continuous measurements.

If the emission levels are proven to be sufficiently stable due to the low mercury content in the fuel, periodic measurements may be carried out only each time that a change of the fuel characteristics may have an impact on the emissions.

The minimum monitoring frequency does not apply in the case of plants operated < 1 500 h/yr.

Measurements are carried out with the plant operated at loads of > 70 %.

In the case of process fuels from the chemical industry, monitoring is only applicable when the fuels contain chlorinated substances.

Substance/ParameterFuel/Process/Type of combustion plantCombustion plant total rated thermal inputStandard(s)f1 Minimum monitoring frequencyf2 Monitoring associated with
NH3
  • When SCR and/or SNCR is used

All sizesGeneric EN standardsContinuousf3 f4 BAT 7
NOX
  • Coal and/or lignite including waste co-incineration

  • Solid biomass and/or peat including waste co-incineration

  • HFO- and/or gas-oil-fired boilers and engines

  • Gas-oil-fired gas turbines

  • Natural-gas-fired boilers, engines, and turbines

  • Iron and steel process gases

  • Process fuels from the chemical industry

  • IGCC plants

All sizesGeneric EN standardsContinuous f5

BAT 20

BAT 24

BAT 28

BAT 32

BAT 37

BAT 41

BAT 42

BAT 43

BAT 47

BAT 48

BAT 56

BAT 64

BAT 65

BAT 73

  • Combustion plants on offshore platforms

All sizesEN 14792Once every yearf6 BAT 53
N2O
  • Coal and/or lignite in circulating fluidised bed boilers

  • Solid biomass and/or peat in circulating fluidised bed boilers

All sizesEN 21258Once every yearf7

BAT 20

BAT 24

CO
  • Coal and/or lignite including waste co-incineration

  • Solid biomass and/or peat including waste co-incineration

  • HFO- and/or gas-oil-fired boilers and engines

  • Gas-oil-fired gas turbines

  • Natural-gas-fired boilers, engines, and turbines

  • Iron and steel process gases

  • Process fuels from the chemical industry

  • IGCC plants

All sizesGeneric EN standardsContinuous

BAT 20

BAT 24

BAT 28

BAT 33

BAT 38

BAT 44

BAT 49

BAT 56

BAT 64

BAT 65

BAT 73

  • Combustion plants on offshore platforms

All sizesEN 15058Once every year BAT 54
SO2
  • Coal and/or lignite including waste co-incineration

  • Solid biomass and/or peat including waste co-incineration

  • HFO- and/or gas-oil-fired boilers

  • HFO- and/or gas-oil-fired engines

  • Gas-oil-fired gas turbines

  • Iron and steel process gases

  • Process fuels from the chemical industry in boilers

  • IGCC plants

All sizesGeneric EN standards and EN 14791Continuous f8 f9

BAT 21

BAT 25

BAT 29

BAT 34

BAT 39

BAT 50

BAT 57

BAT 66

BAT 67

BAT 74

SO3
  • When SCR is used

All sizesNo EN standard availableOnce every year—
Gaseous chlorides, expressed as HCl
  • Coal and/or lignite

  • Process fuels from the chemical industry in boilers

All sizesEN 1911Once every three months f10 f11

BAT 21

BAT 57

  • Solid biomass and/or peat

All sizesGeneric EN standardsContinuousf12 f13 BAT 25
  • Waste co-incineration

All sizesGeneric EN standardsContinuous

BAT 66

BAT 67

HF
  • Coal and/or lignite

  • Process fuels from the chemical industry in boilers

All sizesNo EN standard availableOnce every three months

BAT 21

BAT 57

  • Solid biomass and/or peat

All sizesNo EN standard availableOnce every yearBAT 25
  • Waste co-incineration

All sizesGeneric EN standardsContinuous

BAT 66

BAT 67

Dust
  • Coal and/or lignite

  • Solid biomass and/or peat

  • HFO- and/or gas-oil-fired boilers

  • Iron and steel process gases

  • Process fuels from the chemical industry in boilers

  • IGCC plants

  • HFO- and/or gas-oil-fired engines

  • Gas-oil-fired gas turbines

All sizesGeneric EN standards and EN 13284-1 and EN 13284-2Continuous f14

BAT 22

BAT 26

BAT 30

BAT 35

BAT 39

BAT 51

BAT 58

BAT 75

  • Waste co-incineration

All sizesGeneric EN standards and EN 13284-2Continuous

BAT 68

BAT 69

Metals and metalloids except mercury (As, Cd, Co, Cr, Cu, Mn, Ni, Pb, Sb, Se, Tl, V, Zn)
  • Coal and/or lignite

  • Solid biomass and/or peat

  • HFO- and/or gas-oil-fired boilers and engines

All sizesEN 14385Once every yearf15

BAT 22

BAT 26

BAT 30

  • Waste co-incineration

< 300 MWth EN 14385Once every six months

BAT 68

BAT 69

≥ 300 MWth EN 14385Once every three monthsf16
  • IGCC plants

≥ 100 MWth EN 14385Once every year BAT 75
Hg
  • Coal and/or lignite including waste co-incineration

< 300 MWth EN 13211Once every three months f17 BAT 23
≥ 300 MWth Generic EN standards and EN 14884Continuous f18
  • Solid biomass and/or peat

All sizesEN 13211Once every yearf19 BAT 27
  • Waste co-incineration with solid biomass and/or peat

All sizesEN 13211Once every three months BAT 70
  • IGCC plants

≥ 100 MWth EN 13211Once every yearf20 BAT 75
TVOC
  • HFO- and/or gas-oil-fired engines

  • Process fuels from the chemical industry in boilers

All sizesEN 12619Once every six months

BAT 33

BAT 59

  • Waste co-incineration with coal, lignite, solid biomass and/or peat

All sizesGeneric EN standardsContinuousBAT 71
Formaldehyde
  • Natural-gas in spark-ignited lean-burn gas and dual fuel engines

All sizesNo EN standard availableOnce every yearBAT 45
CH4
  • Natural-gas-fired engines

All sizesEN ISO 25139Once every yearf21 BAT 45
PCDD/F
  • Process fuels from the chemical industry in boilers

  • Waste co-incineration

All sizesEN 1948-1, EN 1948-2, EN 1948-3Once every six months f22

BAT 59

BAT 71

Annotations

Footnotes

f1

Generic EN standards for continuous measurements are EN 15267-1, EN 15267-2, EN 15267-3, and EN 14181. EN standards for periodic measurements are given in the table.

f2

The monitoring frequency does not apply where plant operation would be for the sole purpose of performing an emission measurement.

f3

In the case of plants with a rated thermal input of < 100 MW operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every six months. For gas turbines, periodic monitoring is carried out with a combustion plant load of > 70 %. For co-incineration of waste with coal, lignite, solid biomass and/or peat, the monitoring frequency needs to also take into account Part 6 of Annex VI to the IED.

f4

In the case of use of SCR, the minimum monitoring frequency may be at least once every year, if the emission levels are proven to be sufficiently stable.

f5

In the case of natural-gas-fired turbines with a rated thermal input of < 100 MW operated < 1 500 h/yr, or in the case of existing OCGTs, PEMS may be used instead.

f6

PEMS may be used instead.

f7

Two sets of measurements are carried out, one with the plant operated at loads of > 70 % and the other one at loads of < 70 %.

f8

As an alternative to the continuous measurement in the case of plants combusting oil with a known sulphur content and where there is no flue-gas desulphurisation system, periodic measurements at least once every three months and/or other procedures ensuring the provision of data of an equivalent scientific quality may be used to determine the SO2 emissions.

f9

In the case of process fuels from the chemical industry, the monitoring frequency may be adjusted for plants of < 100 MWth after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

f10

If the emission levels are proven to be sufficiently stable, periodic measurements may be carried out each time that a change of the fuel and/or waste characteristics may have an impact on the emissions, but in any case at least once every year. For co-incineration of waste with coal, lignite, solid biomass and/or peat, the monitoring frequency needs to also take into account Part 6 of Annex VI to the IED.

f11

In the case of process fuels from the chemical industry, the monitoring frequency may be adjusted after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

f12

In the case of plants with a rated thermal input of < 100 MW operated < 500 h/yr, the minimum monitoring frequency may be at least once every year. In the case of plants with a rated thermal input of < 100 MW operated between 500 h/yr and 1 500 h/yr, the monitoring frequency may be reduced to at least once every six months.

f13

If the emission levels are proven to be sufficiently stable, periodic measurements may be carried out each time that a change of the fuel and/or waste characteristics may have an impact on the emissions, but in any case at least once every six months.

f14

In the case of plants combusting iron and steel process gases, the minimum monitoring frequency may be at least once every six months if the emission levels are proven to be sufficiently stable.

f15

The list of pollutants monitored and the monitoring frequency may be adjusted after an initial characterisation of the fuel (see BAT 5) based on an assessment of the relevance of pollutant releases (e.g. concentration in fuel, flue-gas treatment employed) in the emissions to air, but in any case at least each time that a change of the fuel characteristics may have an impact on the emissions.

f16

In the case of plants operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every six months.

f17

In the case of plants operated < 1 500 h/yr, the minimum monitoring frequency may be at least once every year.

f18

Continuous sampling combined with frequent analysis of time-integrated samples, e.g. by a standardised sorbent trap monitoring method, may be used as an alternative to continuous measurements.

f19

If the emission levels are proven to be sufficiently stable due to the low mercury content in the fuel, periodic measurements may be carried out only each time that a change of the fuel characteristics may have an impact on the emissions.

f20

The minimum monitoring frequency does not apply in the case of plants operated < 1 500 h/yr.

f21

Measurements are carried out with the plant operated at loads of > 70 %.

f22

In the case of process fuels from the chemical industry, monitoring is only applicable when the fuels contain chlorinated substances.