Division 4.3.2.4.3 Although it is recommended that each coastdown run be performed without interruption, split runs may be performed if data cannot be collected in a single run for all the reference speed points. For split runs, the following additional requirements shall apply:F1

Original text. Later amendments are not shown.

  1. (a)

    Care shall be taken to keep the vehicle condition as constant as possible at each split point;

  2. (b)

    At least one speed point shall be overlapped with the higher speed range coastdown;

  3. (c)

    At each of all overlapped speed point(s), the average force of the lower speed range coastdown shall not deviate from the average force of the higher speed range coastdown by ± 10 N or ± 5 percent, whichever is greater;

  4. (d)

    If the track length does not allow fulfilling the requirement in point (b), one additional speed point shall be added to serve as overlapping speed point.

Annotations

Textual amendments

F1

Substituted by Commission Regulation (EU) 2018/1832 of 5 November 2018 amending Directive 2007/46/EC of the European Parliament and of the Council, Commission Regulation (EC) No 692/2008 and Commission Regulation (EU) 2017/1151 for the purpose of improving the emission type approval tests and procedures for light passenger and commercial vehicles, including those for in-service conformity and real-driving emissions and introducing devices for monitoring the consumption of fuel and electric energy (Text with EEA relevance).